Laserfiche WebLink
WII IGES <br /> ARCHITECTS <br /> <br /> Fee Percentage Breakdown: <br /> <br />1.1 Schematic and Design Development Phase <br /> Meetings and Base Drawings 10% <br /> Schematics and Alternatives 10% <br /> Develop selected alternative 15% <br /> Cost opinion and prepare 50% submittal 10% <br /> <br />1.2 Construction Document Phase 1.2: <br /> Prepare Construction Documents 25% <br /> Prepare specs, cost opinion and 95% submittal 10% <br /> Revise and prepare 100% Bid documents 5% <br /> Bidding Phase 5% <br /> <br />1.3 Construction Phase: <br /> Construction observation and Close. out 10% <br /> <br /> Total: 100% <br /> <br /> <br />