My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2018-088890 Strada Development Agreement 1548 Maple, LLC
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2018-088890 Strada Development Agreement 1548 Maple, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 1:56:19 PM
Creation date
11/15/2018 10:58:17 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Strada development 1548 Maple St
Doc Num
2018-088890
Rec Date
11/15/2018
APN
052-532-010-7
Address
1548 Maple St.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Blomquist —Developer and County Segments. Subject to the terms of this <br />Section 3.3C, Developer, at its expense, shall construct or cause the construction of the Blomquist <br />— Developer Segment and the portions of the Blomquist Street Extension located on the County - <br />owned parcel designated as APN 050-532-020 and APN 052-532-030 and on the adjacent <br />improved, but substandard, City -owned Maple Street right-of-way located between the Blomquist <br />— City Segment and U.S. Highway 101 (collectively, the "Blomquist — County Segment") as <br />depicted on Exhibit C. The Parties acknowledge that the Blomquist — Developer Segment and <br />Blomquist — County Segment are linked in that construction of one segment, without the other, <br />would not serve the interests of the City or its residents or the inhabitants of the Project. The <br />Parties further acknowledge that Developer's ability to construct or cause the construction of the <br />portion of the Blomquist — County Segment located on the County -owned property is contingent <br />upon City obtaining an appropriate license or right of entry from the County of San Mateo <br />authorizing Developer and its contractors and subcontractors to enter upon the County property <br />for purposes of performing such work (the "County Authorization"). City shall have until the <br />date on which the final temporary certificate of occupancy has been issued for the Project <br />("County Segment Outside Date") to obtain the County Authorization. In no event shall the <br />status of negotiations with the County or the lack of the County Authorization be a basis to deny <br />or delay the issuance or approval of a building permit, certificate of occupancy, or other Project <br />Approval. Regardless of whether City succeeds in its efforts to timely obtain County <br />Authorization, Developer shall be obligated, prior to the County Segment Outside Date, to produce <br />construction and engineering drawings in forms acceptable to City such that City may construct or <br />cause the construction of Blomquist — Developer Segment and Blomquist — County Segment at a <br />later date. If City is able to obtain the County Authorization by the County Segment Outside Date <br />then, to ensure that the construction of the Blomquist — Developer Segment and Blomquist - <br />County Segment is coordinated and appropriately phased with the Project, Developer shall <br />commence construction of the Blomquist — Developer Segment and Blomquist - County Segment <br />on or before the later of (i) ninety (90) days following the date City notifies Developer that City <br />has obtained the County Authorization, or (ii) issuance of the certificate of occupancy for the first <br />residential unit, or such later date as mutually agreed to by the Parties in writing. Developer shall <br />substantially complete the Blomquist - Developer Segment and Blomquist — County Segment <br />within eighteen (18) months after commencement of construction. Notwithstanding anything to <br />the contrary in this Section 3.3.D, in no event shall Developer be required to commence <br />construction of the Blomquist — Developer Segment and Blomquist - County Segment if <br />Developer, after best efforts, is unable to obtain all required permits and authorizations for such <br />work from regulatory agencies including the U.S. Army Corps of Engineers (the "Non -County <br />Authorizations"). <br />D. If by the County Segment Outside Date City is unable to obtain the County <br />Authorization or Developer is unable to obtain the Non -County Authorizations then, in lieu of <br />constructing the Blomquist - Developer Segment and Blomquist - County Segment, Developer <br />shall pay to City within forty-five (45) days following City's demand therefor, an amount equal to <br />One -Million Nine Hundred Ninety Two -Thousand Three Hundred and Seventy Dollars <br />($1,992,370), which amount represents the parties' good faith estimate of the hard costs of <br />constructing the Blomquist —Developer Segment and Blomquist —County Segment <br />("County/Developer Segments In Lieu Payment"). The amount of the County/Developer <br />17 <br />OAK #4843-3885-9090 v1 I <br />ATN/AGR/2018.094/STRADA DEVELOPMENT AGREEMENT <br />REV: 07-27-18 VR <br />Page 17 of 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.