My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agenda 2018-11-19 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agendas
>
2010-2019
>
2018
>
Agenda 2018-11-19 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 4:47:25 PM
Creation date
11/15/2018 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/19/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Recommendation: <br />By motion, approve and authorize the City Manager to execute the Agreement <br />for design / civil engineering consulting services with CSG Consultants, Inc. for <br />the Neighborhood Street Enhancement Program Project in the amount of <br />$157,020 and authorize City Manager to increase the agreement amount, if <br />necessary, up to 10% not to exceed $172,722. <br />CEQA: <br />This is not a project under California Environmental Quality Act (CEQA) <br />6.D. Award of Contract — Sanitary Sewer Pump Station Improvements Project - P.S. <br />No. 20 and P.S. No. 18 <br />Recommendation: <br />By motion, approve and authorize the City Manager to execute the contract <br />documents and award the standard form construction contract 00520 for the <br />Sanitary Sewer Pump Station Improvements Project - P.S. No. 20 (base bid) and <br />P.S. No. 18 (alternate bid) to the lowest responsible bidder, Casey Construction <br />Inc. of Emerald Hills, California for their low bid of $1,682,653.00; and, authorize <br />the City Manager to increase the contract amount, if necessary, up to 10% of <br />the original contract amount, not to exceed $1,850,918.30. <br />CEQA: <br />Categorically Exempt - Class 1 (Existing Facilities) and Class 2 (Replacement or <br />reconstruction) <br />6.E. Final Acceptance — 2016-2017 Sanitary Sewer and Watermain Replacement <br />Project <br />Recommendation: <br />Accept, by motion, the 2016-2017 Sanitary Sewer and Watermain Replacement <br />Project, authorize the release of bonds and retention according to City <br />procedures. <br />CEQA: <br />This is not a project under California Environmental Quality Act (CEQA) <br />6.F. Final Acceptance — Sanitary Sewer Pump Station Improvements Project - P.S. <br />No. 13 and P.S. No. 16 <br />Recommendation: <br />Accept, by motion, the Sanitary Sewer Pump Station Improvements Project - <br />P.S. No. 13 and P.S. No. 16, authorize the release of bonds and retention <br />according to City procedures. <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.