My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2018-090866 1305 El Camino Real_First Amendment to STMMA_11.21.2018
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2018-090866 1305 El Camino Real_First Amendment to STMMA_11.21.2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2019 9:13:39 AM
Creation date
11/26/2018 9:03:59 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA Amendment to 2016-038477
Doc Num
2018-090866
Rec Date
11/21/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the flow-through <br />planter and landscaping remains attractive in appearance. Table 1 shows the routine maintenance <br />activities, and the frequency at which they will be conducted. In addition, <br />Table 1 <br />Routine Maintenance Activities for Treatment Devices <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Remove accumulated sediment, litter, and debris from KrIStar Media Filter and <br />Before wet season and as <br />dispose of properly. Confirm that no clogging will occur and that the treatment <br />necessary <br />device will drain per design standards. <br />2 <br />Inspect KriStar Perk Filter Cartridges to ensure that there are no clogs. Testwith <br />Monthly during the wet season, <br />garden hose to confirm thatthe filters will drain per design standards. <br />and as needed after storm events <br />3 <br />Inspect podium drains, roof drains, and sheet flow from paved areas to ensure <br />Monthly during the wet season, <br />flow to KriStar Media Filters is unimpeded. Remove debris and repair damaged <br />and as needed after storm events <br />pipes. Check splash blocks or rocks and repair, replace, and replenish as <br />necessary. <br />4 <br />Inspect overflow pipe to ensure that it will safely convey excess flows to storm <br />Before the wet season, and as <br />drain. Repair or replace any damaged or disconnected piping. <br />necessary <br />5 <br />Inspect KriStar Media Filter to ensure that manhole is structurally sound (no <br />Annually <br />cracks or leaks). Repair as necessary. <br />6 <br />Inspect KriStar Media Filter using the attached inspection checklist for Level 1, <br />Per manufacturer's <br />Level 2, and Level inspections (see attached KriStar FloGard Perk Filter System <br />recommendations (attached) <br />O & M Manual) <br />7 <br />Remove accumulated sediment, litter, and debris from KriStar Media Filter and <br />Before wet season and as <br />disposeofproperly. Confirm that flow is directed to pump. <br />necessary <br />8 <br />Storm drain pumps for treatment and discharge follows will be maintained to <br />On-going <br />preventfailure. Inoperable pumps must be repaired or replaced immediately. <br />Page 2 <br />Page 8 of 10 <br />REV: 09-28-18 PR <br />ATTY/AGR.Amend No.1/RWC ECR Venture, LLC - STMMA 1st Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.