My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2018-090866 1305 El Camino Real_First Amendment to STMMA_11.21.2018
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2018-090866 1305 El Camino Real_First Amendment to STMMA_11.21.2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2019 9:13:39 AM
Creation date
11/26/2018 9:03:59 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA Amendment to 2016-038477
Doc Num
2018-090866
Rec Date
11/21/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED EXHIBIT C <br />Redwood City 137 <br />1305 EI Camino Real <br />Storm Water Treatment Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection and <br />maintenance conducted for the identified storm water treatment measure(s) subject to the <br />Maintenance Agreement between the City and the property owner during the annual reporting <br />period indicated below. <br />Property Information: <br />Property Address or APN: 053-174-090, 100, 110 & 120 <br />Property Owner: RWC ECR Venture, LLC <br />It. Contact Information: <br />Name of person to contact regarding this report: Jonathan Fearn <br />Contact Number: (415) 527-2869 Email: ionathao.fearntaareystar.com <br />Address to which correspondence regarding this report should be directed: <br />450 Sansome Street, Suite 500 <br />San Francisco, CA 94111 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections and <br />maintenance of the identified treatment measures during the time period from: <br />to <br />IV. Storm Water Treatment Measure Information: <br />The following storm water treatment measures (identified treatment measures) are located on <br />the property identified above and are subject to the Maintenance Agreement: <br />Treatment Device <br />Type of Treatment <br />Location <br />Media Filter Vault #1 <br />(4) 18" & 12" Perk Filters <br />In garage at Diller Street <br />Detention Vault <br />N/A <br />In garage at Diller Street <br />Page 1 O&M Inspection Report <br />Page 5 of 10 <br />REV: 09-28-18 PR <br />ATTY/AGR.Amend No. 1/RWC ECR Venture, LLC - STMMA 1st Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.