My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Bartle Wells Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 Bartle Wells Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2018 11:28:52 AM
Creation date
11/27/2018 11:28:44 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bartle Wells Associates, Inc.
PROJECT NAME
Water & Sewer Rate Study
RMP File Number
304.5
Date
11/19/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Evaluation of current development fees and procedures <br />• Regional water and sewer development impact fee surveys <br />• Identification of alternative fee methodologies or approaches <br />• Calculations of new water, sewer and potential recycled water capacity charges <br />Phase 5 <br />Tasks <br />• Evaluate the Silicon Valley Clean Water (SVCW) budget and its impact upon the City's share of <br />SVCW's costs for administration, operation and CIP <br />• Recommend rate and fee structures for potable water, recycled water, and sewer utilities that <br />will fairly recover allocated costs and adequately fund reserves. Rate structure <br />recommendations will consider current and future operations and maintenance costs, projected <br />demands, water supply, and capital improvement requirements. <br />• Review impacts of projected new development and redevelopment on rates, including <br />differentiation of capital costs associated with rehabilitation/replacement of existing utilities <br />from capital costs for improvements required for expansion of service as a result of new <br />development. <br />• Attend two Utilities Committee Meetings/Rate Workshops to present finding, recommendations <br />and key alternatives. Respond to questions and obtain input for development of rate and fee <br />recommendations <br />• Conduct a minimum of two community meetings to inform the public of any rate changes prior <br />to the Proposition 218 hearing. <br />• Meet with City to discuss final recommendations <br />• Attend the Public Hearing for the adoption of new rates <br />Deliverables <br />• Draft and final reports that summarize key findings and recommendations and demonstrate <br />compliance with legal requirements for rates and capacity charges. Final draft will serve as a <br />document of record. Draft and final reports will be made available in Word, Excel and PDF file <br />formats and shall be editable by City Staff. Final draft due to City no laterthan July 31, 2019. <br />• Draft of Proposition 218 Notice of proposed rate increases <br />• Attend up to two meetings/rate workshops with the Utilities Committee to present findings, <br />recommendations and alternatives and receive input for inclusion in the final report. <br />• Power Point presentation to support each Utilities Committee Meeting shall be provided to City <br />staff no later than two weeks prior the meeting. <br />• Conduct/participate in a minimum of two community meetings to inform the public of any rate <br />changes prior to the Proposition 218 hearing. <br />• Template Power Point presentation slides in support of the Public Hearing shall be provided no <br />later than one month priorto the meeting <br />REV: 11-08-18 VR <br />Page 11 of 13 <br />ATTY/AGR.2018.260/Bartle Wells/Water & Sewer Utility Rate Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.