My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-12-03 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-12-03 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 5:57:51 PM
Creation date
11/29/2018 5:35:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/3/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.13. - Page 4 of 36 <br />t� ► � t, ► • • ' lJ L.L. : L r ti = <br />THIS FIRST AMENDMENT TO Stormwater Treatment Measures Maintenance <br />Agreement, 815 Hamilton Street, ("First Amendment") is made and entered into this <br />day of , 2018 ("Effective Date"), by and between Hamilton & Winslow <br />Properties, LLC, a California limited liability company ("H&WP"), and the CITY OF <br />REDWOOD CITY, a charter city and California municipal corporation (City"). <br />A. H&WP and City entered into that certain Stormwater Treatment Measures <br />Maintenance Agreement dated October 24, 2015 and recorded December 1, 2015 as <br />instrument Number 2015-126535, in the Official Records of the County of San Mateo <br />("Stormwater Treatment Measures Maintenance Agreement"). <br />B. The Stormwater Treatment Measures Maintenance Agreement included <br />references to a legible reduced -scale copy of the site plan showing the stormwater <br />treatment measures that are to be located or constructed on the Property ("Site Plan") <br />and installed and maintained by the agreement as shown on Exhibit B attached to the <br />Stormwater Treatment Measures Maintenance Agreement. <br />C. Since the recordation of the Stormwater Treatment Measures <br />Maintenance Agreement, an additional treatment facility was installed during the <br />construction of the stormwater treatment measures which required modifications to the <br />Site Plan. Winslow requested these modifications to the stormwater treatment <br />measures, and in doing so was required to alter the Site Plan. <br />D. The revised Site Plan is further detailed on Revised Exhibit B to this First <br />Amendment. <br />NOW, THEREFORE, HW&P and the City hereby amend the Stormwater <br />Treatment Measure Maintenance Agreement as follows: <br />1. Exhibit B to the Stormwater Treatment Measures Maintenance Agreement <br />is of no further force and effect and is hereby replaced with Revised Exhibit B, attached <br />hereto and incorporated by reference. <br />2. In all other respects the Stormwater Treatment Measures Maintenance <br />Agreement shall remain in full force and effect. <br />3. This First Amendment may be executed in any number of counterparts <br />which together shall constitute the contract of the Parties. <br />RPV: 11-01-18 PR <br />Page 2 of 3 <br />ATTYIAGR.Amend No. 1 11st Amendment to STMMA - Hamilton & Winslow Properties, LLC 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.