My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-12-17 Joint Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-12-17 Joint Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 1:26:47 PM
Creation date
12/18/2018 9:28:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/17/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: 27990035-B8E8-4557-9AOD-5A1C5392E9EO <br />6.E. - Page 12 of 26 <br />Attachment 1 <br />WORK PLAN <br />(Project Description) <br />Project 10: Redwood City Bayfront Canal and Atherton Channel Mood Improvement and <br />Habitat Restoration Project <br />The Bayfronf Conol/Atherton Channel Flood Improvement Project alleviates local <br />flooding by routing flood flows from the Bayfront Canal and Atherton Channel into <br />managed ponds that are part of the Ravenswood Pond Complex portion of the South <br />Bay Salt Ponds Resforafion Project. This project includes modification of the existing <br />Cargill ditch for improved flow conveyance, and modifications to the Pond S5 forebay <br />including excavafion/deepening of this smaller portion of Pond S5 immediately <br />adjacent to Flood Slough. Flood flows from the Bayfront Canal will bypass the blood <br />Slough tide gafe and will be routed into Ponds R5 and S5 of the Ravenswood Pond <br />Complex. The Bayfront Canal/Atherton Channel Flood Improvement Project supports <br />habitat improvements of the seasonal freshwoferwet lands locally within Ponds RS and <br />S5, and the larger South Bay Salt Ponds Restoration Project, while providing waterfowl <br />habitat for special -status species such as the wesfern snowy plover. <br />Task 1: Direct Project Administration — Budget Category (a) <br />Task 1 a) Project Administration <br />This task consists of the project administration responsibilities, which includes <br />coordinating agency responsibilities and managing cost commitments. This task also <br />includes providing other supporting documentation required for fhis grant agreement <br />(e.g., financial statements, etc.). <br />Deliverables: <br />• Environmental Information Form (EIF) <br />• Financial Statements <br />• Other Applicable Project Deliverables <br />Task 1 b) Quarterly Progress Reports <br />This task consists of preparing progress reports detailing work completed in prior quarter <br />as outlined in Exhibit G of the Grant Agreement (Attachment 3) and submitting to <br />the Grantee for its submitta[ to DWR review. <br />Deliverables: <br />• Quarterly Project Progress Report <br />Task 1 c) Invoices <br />This task consists of preparing quarterly invoices including relevant supporting <br />documentation for submittal to DWR via Grantee. <br />Deliverables: <br />DWR Prop 84 - Local Project Sponsor Agreement --- IRWM 2 - Redwood City - OWP 102244 <br />160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.