Laserfiche WebLink
DocuSign Envelope ID: 27990035-B8E8-4557-9AOD-5A1C5392E9E0 <br />6.E. - Page 15 of 26 <br />Attachment 1 <br />This fask consists of mobilization and site preparation including implementation of site <br />security measures, installation of temporary sanitary facilities, implementation of site <br />BMPs, clearing and grubbing, stockpile and material storage designation, and traffic <br />control. <br />Deliverables: <br />• Pre-consfruction photographs <br />Task 4 c) Project Construction <br />This task includes local flooding alleviation by routing flood flows from the Bayfront <br />Canal and Atherton Channel into managed ponds that are part of the Ravenswood <br />Pond Complex portion of the South Bay Salt Ponds Restoration Project. This task consists <br />of modification of the existing Cargill ditch for improved flow conveyance, <br />modifications to the Pond S5 forebay including excavation/deepening of this smaller <br />portion of Pond S5 immediately adjacent to Flood Slough, and routing of flood flows <br />from the Bayfront Canal info Ponds R5 and S5 of the Ravenswood Pond Complex, <br />thereby bypassing the Flood Slough fide gate. <br />Deliverables: <br />• Construction photographs <br />• Certified engineer inspection completion report with final as -built drawings <br />Task 4 d) Performance Testing and Demobilization <br />This task consist of project performance testing and demobilization, including removal <br />of all debris and construction spoils from the site, removal of excess materials, removal <br />of temporary sanitary facilities, removal of equipment, transfer of site responsibility back <br />to owner, and stormwater testing for contaminants and turbidity levels. <br />Deliverables: <br />• Post -construction photographs <br />Task 4 e) Environmental Compliance/ Mitigation/ Enhancement <br />This task consists of complying with general construction measures, and creating an <br />erosion and sediment control plan, stormwater pollution prevention plan, traffic control <br />plan, a hazardous materials management plan, and any environmental restoration <br />specifications. <br />Deliverables: <br />• A copy of the erosion and sediment control plan <br />• A copy of the stormwater pollution prevention plan <br />• A copy of the traffic control plan <br />• A copy of the hazardous materials management plan <br />• A copy of the environmental restoration specifications <br />Task 4 f) Construction Administration <br />DWR Prop 84- Local Project Sponsor Agreement- IRWM 2 - Redwood City- OWP 102244 <br />12 of 16 <br />163 <br />