My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2018-097857
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2018-097857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2019 10:41:59 AM
Creation date
1/3/2019 10:38:34 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
First Amendment to STMMA 2015-126535
Doc Num
2018-097857
Rec Date
12/17/2018
Address
815 Hamilton
Parties
Hamilton & Winslow Properties, LLC
MO Ref
18-224
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRST AMENDMENT TO STORMWATER TREATMENT MEASURES MAINTENANCE <br />AGREEMENT <br />THIS FIRST AMENDMENT TO Stormwater Treatment Measures Maintenance <br />Agreement, 415 Hamilton Street, ("First Amendment") is made and entered into this <br />day of 2018 ("Effective Date"), by and between Hamilton & Winslow <br />Properties, LLC, a California limited liability company ("H&WP"), and the CITY OF <br />REDWOOD CITY, a charter city and California municipal corporation ("City"). <br />RECITALS <br />A. H&WP and City entered into that certain Stormwater Treatment Measures <br />Maintenance Agreement dated October 24, 2015 and recorded December 1, 2015 as <br />instrument Number 2015-126535, in the Official Records of the County of San Mateo <br />("Stormwater Treatment Measures Maintenance Agreement"). <br />B. The Stormwater Treatment Measures Maintenance Agreement included <br />references to a legible reduced -scale copy of the site plan showing the stormwater <br />treatment measures that are to be located or constructed on the Property ("Site Plan") <br />and installed and maintained by the agreement as shown on Exhibit B attached to the <br />Stormwater Treatment Measures Maintenance Agreement. <br />C. Since the recordation of the Stormwater Treatment Measures <br />Maintenance Agreement, an additional treatment facility was installed during the <br />construction of the stormwater treatment measures which required modifications to the <br />Site Plan. Winslow requested these modifications to the stormwater treatment <br />measures, and in doing so was required to alter the Site Plan. <br />D. The revised Site Plan is further detailed on Revised Exhibit B to this First <br />Amendment. <br />NOW, THEREFORE, HW&P and the City hereby amend the Stormwater <br />Treatment Measure Maintenance Agreement as follows: <br />1. Exhibit B to the Stormwater Treatment Measures Maintenance Agreement <br />is of no further force and effect and is hereby replaced with Revised Exhibit B, attached <br />hereto and incorporated by reference. <br />2. In all other respects the Stormwater Treatment Measures Maintenance <br />Agreement shall remain in full force and effect. <br />3. This First Amendment may be executed in any number of counterparts <br />which together shall constitute the contract of the Parties. <br />REV: 11-01-18 PR <br />Page 2 of 3 <br />ATTY/AGR.Amend No. 1 /1st Amendment to STMMA - Hamilton & Winslow Properties, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.