My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Power Engineering - parts replacement services for sanitary sewer lift station 16, 19 & 20
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 Power Engineering - parts replacement services for sanitary sewer lift station 16, 19 & 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2008 1:23:42 PM
Creation date
5/1/2006 11:41:48 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Power Engineering Contractors
PROJECT NAME
sanitary sewer lift stations 16 19 and 20
RMP File Number
304.5
Date
4/27/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />84/18/2006 89:07 <br /> <br />4883564798 <br /> <br />?I.JÆR EHG <br /> <br />PAGE 83 <br /> <br />EXHIBIT A (continued) <br /> <br />CIty of Redwood (.1ty h., Sltoe Replace..t <br />PEe Pro~~n <br /> <br />E:¡duiou <br /> <br />1. <br /> <br />Hazardous mataiaJs lumdliì\g OJ :removal. <br /> <br />AsRaa pÛOlll <br /> <br />1. <br /> <br />Work wi11 take pJ.aœ duriD¡ D.ODDIÛ workina hours. Specifically, Power <br />Bnpleering~s crew will work trom 9 AM to S:30 PM. City to provide a <br />minimwn ufsix 001.111 of1imc in the well per shift. <br />New anchor bo1t8 will be 31685 Hiltí HIT - TZ tIm:aded rod hold-dowD. bolts <br />epoxy øct in Hilti. I IY.. 1 SO. Hi1Ii HIT. TZ --.bot bol8l1DPlmum diameter is %». <br />If exisiiua aød1orbolts arc Jar¡cr than %"'. 31688 aU-dlraldmd of the appropriate <br />9Í æwiU be WI8d in lieu of: the HIT - TZ ancbora. <br /> <br />2. <br /> <br />SeopeofWork <br /> <br />1. <br /> <br />The CÎt7 of 'Redwood at, will provide .. foU~ <br />a. Begin wnrJr. prior to Powa' ~ INCh that Pøwcr's orc:w CAlI bc:gia <br />their portioo of the wmt at 9 AM. <br />b. Plua aravity linea ÌDtO each ststiøn. <br />c. Dewater and wash down 'Wâ 'Well. <br />d. RemovelReiDstall exùIit1& pumps. <br />e. Provide DeW pump base shoes, dc1iveœd to aach pump station. <br />f. Remove plup in gravity Jines at ClOd of sbitl <br />Pøwør ~ will pœvide the followbl¡: <br />g. Cnn~ Space cmry control (top 1DIIl) and safety lear. <br />h. Removal BOd rein8taU8Don of pipiDg as requimI USÚ1I new 31688 bolts. <br />, ami new p.sketa. <br />1. RanovaJ aDd retnsvûJadon of guide ban. <br />j. RaDo\'w of a.xhtûD¡. pump sbocs. <br />k. ~ ødsting pump beae ba Itl and tq)htœ wi tb DCW 31688 HíJ Li HIT- <br />TZ threaded rod hold-down bolÙJ epoxy 8Ct in HiJtì HY-ISO. <br />1. Wodt to be øebCldu1od 1M one pump per 1tati0ll pel' 8bit\. To ooa:aplcœ aU <br />six pump buea wiD ute up to . ahiftø. <br />m. One bme traØk control (sips aad cooeøIdeJine8ton) at St:8tÍoI1 #20 .. <br />requimd. Plagrnen are not inch1ded. <br /> <br />2. <br /> <br />I Page 2 of 2 I <br /> <br />Recllved 04-ln-ZOO6 n9=O4am <br /> <br />Fr.-4083S64Tea <br /> <br />To-Redwood CI ty PIS <br /> <br />Pap nos <br />
The URL can be used to link to this page
Your browser does not support the video tag.