My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-05-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-05-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2006 3:34:19 PM
Creation date
5/4/2006 2:55:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/8/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.18 <br />Page 1 <br /> <br />REPORT <br /> <br /> <br />May 8, 2006 <br /> <br />Subject <br />Award of Contract - Fleishman Park Renovation Project <br /> <br />Recommendation <br />Approve the Contract Documents and award the contract for the Fleishman Park <br />Renovation Project to the lowest responsible bidder, Star Construction, Inc. of San <br />Bruno, California, for their low bid of $500,000.00. <br /> <br />Background <br />Fleishman Park is a .64 acre park originally constructed in the 1940's, and <br />reconstructed in the 1980's, and is located at the intersection of McEvoy and Locust <br />Street. <br /> <br />The existing park, with deteriorated equipment and picnic facilities, is being heavily <br />used by the residents. This project will refurbish the park and all the associated <br />facilities. A water play feature, similar to the one installed at Spin as Park, will also be <br />added. <br /> <br />The design of the park has been on-going since last summer, and four meetings were <br />held with neighborhood representatives to solicit design ideas from the public. The park <br />design was done by AAM Design, who also successfully designed the Woodside Road <br />Median Renovation Project. <br /> <br />The Fleishman Park renovation will include furnishing and installing new prefabricated <br />restroom structures, new playground safety surfaces, construction of new concrete <br />walkway, new landscaping elements, new site furnishings, planting of new plant <br />materials, new safety fence, and new playground equipment. <br /> <br />Four (4) bids were received at the bid opening on April 12, 2006. The results <br />are summarized below: <br /> <br />No. Bidder Bid Amount <br />1. Star Construction, Inc. - San Bruno, CA $500,000.00 <br />2. Robert A. Bothman, Inc. - San Jose, CA $650,622.00 <br />3. Scapes, Inc. - Half Moon Bay, CA $721,489.00 <br />4. Blossom Valley Construction - San Jose, CA $737,374.00 <br /> <br />The bid amount of $500,000 is 1.4% below the Engineer's Estimate of $507,000 for the <br />cost of construction, and is considered a good and responsive bid. <br /> <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.