My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-05-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-05-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2006 3:34:19 PM
Creation date
5/4/2006 2:55:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/8/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1J <br />Page 3 <br /> <br />AGREEMENT <br />for the <br />City of Redwood City <br /> <br />2005-2006 Asphalt Concrete Materials Purchase <br /> <br />This AGREEMENT, made this - day of , 2006, by and between <br />Graniterock Company whose place of business is at 365 North Blomquist Street, Redwood City, <br />CA 94063, hereinafter called "SUPPLIER", and the City of Redwood City, a charter city and <br />municipal corporation of the State of California, hereinafter referred to as "CITY". <br /> <br />In consideration of the mutual covenants hereinafter set forth, Supplier and City agree as <br />follows: <br /> <br />I. <br /> <br />II. <br /> <br />III. <br /> <br />MATERIALS <br /> <br />A. <br /> <br />Supplier shall provide all Materials specified in the Contract Documents, in <br />accordance with the Specifications, Standards, Details, and all other terms and <br />conditions of the Contract Documents. <br /> <br />CONTRACT SUM <br /> <br />A. <br /> <br />City shall pay the Supplier as the "Contract Sum" for provision of Materials in <br />accordance with the Contract Documents, as the amount of not-to-exceed One <br />Hundred Seventy Five Thousand Four Hundred and Thirty Three Dollars <br />($175,433.00), based on the suppliers bid of Two Hundred Twenty Eight Thousand <br />One Hundred Twenty Eight dollars ($228,128.00), computed in accordance with <br />Supplier's Accepted Proposal dated. March 27, 2006, which Proposal is <br />incorporated herein by reference thereto as if fully set forth. The contract period <br />covers three (3) fiscal years and the subsequent annual contract amount will be <br />determined <br /> <br />B. <br /> <br />The Contract Sum is all inclusive and includes all Materials; all federal, state. and <br />local taxes on materials and equipment, and labor furnished by Supplier, its <br />subcontractors, subconsultants. architects, engineers, and vendors or otherwise <br />arising out of Supplier's provision of the Materials, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use. excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other <br />taxes on any item or service that is part of the Work, whether such taxes are <br />normally included in the price of such item or service or are normally stated <br />separately. Notwithstanding the foregoing, each party shall bear such state or local <br />inventory, real property, personal property or fixtures taxes as may be properly <br />assessed against it by applicable taxing authorities. <br /> <br />CONTRACT TIME AND MATERIAL AVAILABILITY <br /> <br />A. Supplier shall provide the Materials as set forth in the bid proposal, General <br />Conditions, and General Requirements; and <br />Atty/ Agr/2006.002 <br />050106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.