Laserfiche WebLink
-t:ITY OF REDWOOD CITY Exhibit "C" <br />SEAPORT CENTRE MAINTENANCE DISTRICT <br />NOTICE OF PROPOSED ASSESSMENT <br />FY 2000/01 FY 2001/02 <br />District Assessment <br />APN Levy O1Levy 02Levy <br />Total Owner Levy O1TotL.evy 02TotLevy <br />Property Owner <<Name» <br />«Company» <br />«Attention» <br />FY 2002/03 FY 2003/04 FY 2004/05 <br />03Levy 04Levy 05Levy <br />03TotLevy 04TotLevy 05TotLevy <br />Mailing Address «Address3» <br /><<City», <<State» <<PostalCode» <br />Property Owner Maximum Annual Levy: TotMaxLevy <br />Property Owner 5 -Year Cumulative Levy: TotCumLevy <br />Reason for the Proposed Assessment: On April 22, 1985 the City Council of the City of <br />Redwood City established the Seaport Centre Maintenance District (the "District") which <br />provided for the levy of annual assessments on parcels within the District pursuant to a method <br />of assessment spread in an aggregate amount sufficient to pay for estimated annual <br />maintenance expenses associated with public improvements relating to levees, storm drains, <br />water facilities and sanitary sewer facilities (the "Facilities") in the District, the operation and <br />maintenance of which benefited privately owned parcels within the District. On November 5, <br />1996 California voters approved Proposition 218, an amendment to the California Constitution <br />that requires existing, new or increased assessments, beginning July 1, 1997, to be approved by <br />affected property owners pursuant to a majority vote. Each property will receive one ballot that <br />is weighted according to the proportional financial obligation of the affected property. <br />The 5 -year budget is detailed in the Engineer's Report, which is on file with the City Clerk and <br />available for public inspection. <br />Description of Improvements: The Facilities to be maintained by the District include 1) any <br />and all levees for the protection of the Seaport Centre project from inundation, any and all <br />retaining walls, and any and all outboard rock slope protection facilities necessary for erosion <br />control, together with any and all appurtenances to any of the above now existing or hereafter <br />to be constructed in or for the Seaport Centre project; 2) any and all surface and subsurface <br />storm drainage facilities, including, but not limited to, storm drain pump stations, storm drain <br />mains, manholes with manhole frames and covers, and inlets and catch basins, together with <br />any and all appurtenances to any of the above now existing or hereafter to be constructed in or <br />for the Seaport Centre project; 3) any and all water facilities, including but not limited to, water <br />mains, valves, tees, hydrants, services, meters and meter boxes, together with any and all <br />appurtenances to any of the above now existing or hereafter to be constructed in or for the <br />Seaport Centre project; and, 4) any and all sanitary sewer facilities, including but not limited to, <br />sanitary sewer mains, manholes with manhole frames and covers, cleanouts and laterals, <br />together with any and all appurtenances to any of the above now existing or hereafter to be <br />constructed in or for the Seaport Centre project. <br />1 13904 <br />