My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-05-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2006 10:51:27 AM
Creation date
5/18/2006 3:24:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/22/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> LEAGUE URGES SUPPORT ON SB 1431 <br /> BILL WOULD SA VE CITIES TIME AND MONEY BY USING DESIGN-BUILD CONTRAalNG <br />SB 1431 (Cox) is a bill that would allow all cost-effective completion of public works projects. <br />cities, upon approval of the city council, to use Design-build contracting has also shown it is <br />design-build contracting through January 1,2017. effective in reducing project cost and expediting <br />This method is currently available only to some project completion. <br />cities in California. The bill, currently held in the <br />Senate Appropriations Committee, also allows Talking Points <br />design-build contracting for counties and special <br />districts. Below are some talking points to use when <br /> speaking with Sen. Murray: <br />If your city could benefit from using design- <br />build contracting, the League encourages you to . Allowing cities options to use design-build <br />call or write Sen. Kevin Murray, chair, Senate contracting can bring greater efficiency to public <br />Appropriations Committee, to express your sup- contracting. <br />port for SB 1431. Sen. Murray can be reached by . Design-build contracting has shown it is <br />phone at (916) 651-4101 and his office fax number effective in reducing project cost and expediting <br />is (916) 445-8899. A sample letter can be found project completion. <br />by looking up SB 1431 on the League's website at . This bill allows cities to use design-build if <br />www.cacities.ora/billsearch. desired, allowing cities the option of a more <br />If you elect to send a letter, please send copies efficient process. <br /> . Design-build contracting combines the two <br />to the following people: major phases of a construction project into one. <br /> Sen. Dave Cox: (916) 651-4001 (office), In this way the problems identified by a construc- <br />. tion contractor while building a project designed by <br />(916) 324-2680 (fax) a design contractor can be worked out before the <br />. Members of the Senate Appropriations construction actually begins. Public agencies <br />Committee: (916) 445-8899 (fax) save money by speeding the delivery of projects <br />. Sen. Don Perata: (916) 327-1997 (fax) and by reducing litigation claims caused by <br />. Sen. Sam Aanestad: (916) 445-7750 (fax) change orders during the construction phase. <br />. Chair and Members, Assembly Local . The collaborative project management <br />Government Committee: (916) 319-3959 (fax) envisioned by design-build completes work faster <br />. Crystal Chase, consultant, Senate Repub- with fewer problems, and one entity is responsible <br />Iican Caucus: (916) 445-3105 (fax) for cost, schedule, and performance. In addition, <br />. Craig Swaim, consultant, Governor's the design-build contractor assumes all the risk to <br />Office of Planning and Research: (916) 323-2675 deliver the project on time. <br />(fax) <br />. Uisa Lawson Stark, legislative representa- <br />tive, League of California Cities: (916) 658-8240 <br />(fax) <br />Why We Support This Bill <br />The option to use design-build contracting can <br />bring greater efficiency to public contracting. The <br />design-build method could be used on construc- <br />tion projects costing over $2.5 million. SB 1431 <br />will give cities maximum flexibility for timely and <br />Visit the League's Official Websiteuwww.cacities.org PRIORITY FOCUS. PAGE 5 <br /> May 12, 2006 . Issue #19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.