My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-05-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2006 10:51:27 AM
Creation date
5/18/2006 3:24:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/22/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 5.18 <br /> Page 1 <br />f(~P>()f?T <br />May 22, 2006 <br />Subject <br />Award of Contract - Red Morton Community Park Gardener Shed Replacement Project <br />Recommendation <br />Approve the Contract Documents and award the contract for Red Morton Community <br />Park Gardener Shed. Replacement Project to the lowest responsible bidder, T. <br />Campbell Construction of Manteca, California, for their low bid of $165,943.00. <br />Background <br />The Gardener Shed is located at 1400 Roosevelt Avenue in the City of Redwood City, <br />and is maintained by the Parks, Recreation, and Community Services Department <br />(PRCS). <br />The existing gardener shed used to be a trash enclosure, and was modified in 1976 to <br />be used as the PRCS gardener shed storage for tools and materials. The existing <br />gardener shed is deteriorating; the roof leaks, and many service calls have been <br />reported due to rodent infestation. Therefore, staff recommends that the facility <br />undergo a major reconstruction. <br />The scope of the work for this project consists of tree and plant protection; installation <br />of temporary project security fence; clearing; demolition and removal of existing <br />structures; site preparation and grading; concrete work; structural and miscellaneous <br />steel work; furnishing and installation of prefabricated galvanized steel building and <br />related work; electrical work; restoration of existing lawn or other improvements <br />removed or damaged; dust alleviation and control; storm water pollution prevention, and <br />daily site cleanup and other incidental work. <br />On April 5, 2006, a bid opening was held. The three (3) bids received for the Red <br />Morton Community Park Gardener Shed Replacement Project are summarized below: <br /> I <br /> ! <br />Rank Contractor Amount <br />1. T. Campbell Construction - Manteca, CA $165,943.00 <br />3. G & G Builders - Pleasanton, CA $174,207.00 <br />2. CJV Construction, Inc. - Redwood City, CA $224,166,00 <br />The low bid by T. Campbell Construction was 38% higher than the Engineer's Estimate <br />of $120,000.00. However, after performing a thorough bid evaluation, and taking into <br /> Page 1 of 2 <br /> .....~ --_.._--_._._,.~-_.._~--"-_.-._._._". <br />
The URL can be used to link to this page
Your browser does not support the video tag.