My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Presidio Systems, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 Presidio Systems, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 6:36:49 PM
Creation date
1/7/2019 9:21:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Presidio Systems, Inc.
PROJECT NAME
On-Call CCTV Service
RMP File Number
304.5
Date
11/29/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The inspections shall document the following National Association of Sewer Service <br />Companies (NASSCO) (PACP) formatted observations: <br />• Cracks - radial and longitudinal, hairline oropen; <br />• Laterals (identify active or inactive, if possible) - quadrant location, protruding, <br />cracks, roots; <br />• Corrosion - iron stains, roughened aggregate, exposed aggregate, exposed rebar, <br />or exposed soil; <br />• Offsets/sage - 1 -inch, 2 -inch, 4 -inch, etc. <br />• Roots - light, moderate, heavy, or matted roots; <br />• Grease - light, moderate, or heavy; <br />• Infiltration - water strains, dripping water, or stream of water; <br />• Other - holes in pipe, missing tile; <br />• Pictures of all pipe defects that are Severity Grade 3 and greater in JPEG format <br />labeled with line and footage. <br />C. Deliverables <br />Contractor shall submit CCN inspection reports via electronic file data transmittals using <br />shared cloud data storage, provision of hard drives, flash drives, and/or by DVD. Electronic <br />submittals will include: <br />• Video Files in MPEG -4 format; <br />• Pictures of all pipe defects that are Severity Grade 3 and greater in JPEG format, <br />labeled with line and footage; <br />• NASSCO/PACP Inspection reports; and <br />• Inspection Logs. <br />If video and/or captured images do not clearly show the pipe conditions due to an inadequate <br />amount of light or are of such poor quality that staff is unable to evaluate the condition of the <br />sewer or locate sewer service connections, Contractor is responsible for re -televising that <br />section of the pipe at the Contractor's expense. <br />Contractor will submit all deliverables within 24 hours after completion of inspection. <br />Deliverables may be provided via hard drive to the Public Works Municipal Services Center <br />or electronically emailed to Public Works staff. <br />REV: 11-01-19 EI <br />ATTY/AGR.Amend No. 1/Presidio Systems (Page 4 of 5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.