My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-01-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-01-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:35:29 AM
Creation date
1/24/2019 4:28:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.G. - Page 43 of 238 <br />delivery of In Lieu Water will be recovered from the SFPUC Storage Account during water <br />shortages using new Regional Project Facilities or Shared Facilities operated by the <br />Participating Pumpers and the SFPUC. Project mitigation capital costs and annual Project <br />operations and maintenance expenses and water supplies shall be allocated as follows: <br />A. All In Lieu Water delivered to the Participating Pumpers shall be (1) temporary <br />and interruptible in nature and (2) at the sole discretion of the SFPUC based on the total volume <br />of water available to the Regional Water System. <br />B. All In Lieu Water delivered to the Participating Pumpers shall be considered a <br />delivery of water to storage and shall not be construed to affect or increase the Individual <br />Supply Guarantees of these Wholesale Customers or to otherwise entitle them to any claim of <br />water in excess of their Individual Supply Guarantees. <br />C. In the event that it is necessary to reduce the Participating Pumpers' aggregate <br />designated quantity of groundwater production allocation pursuant to Section 4.7 of the Project <br />Operating Agreement, the SFPUC may supply an annual maximum of up to 500 acre feet of <br />Participating Pumper Replacement Water from the Regional Water System at a price <br />comparable to the Participating Pumpers' then -current groundwater cost, as may be adjusted <br />annually as provided for in Section 4.7 of the Project Operating Agreement. Each of the <br />Participating Pumpers may elect to take delivery of its share of Participating Pumper <br />Replacement Water either as interruptible surface water deliveries from the Regional Water <br />System or as a transfer of storage credits from the SFPUC Storage Account. All revenue <br />received from such water sales or transfers shall be considered revenue related to the sale of <br />water and allocated between Retail Customers and Wholesale Customers on the basis of <br />Proportional Water Use. All volumes of Participating Pumper Replacement Water delivered <br />shall not be construed to affect or increase the Individual Supply Guarantees of these <br />Wholesale Customers or to otherwise entitle them to any claim of water in excess of their <br />Individual Supply Guarantees. <br />D. Any operation and maintenance expenses incurred by the Participating Pumpers <br />and the SFPUC that are related to the operation of Project Facilities and Shared Facilities for <br />Project purposes shall be included as Regional pumping expenses under Section 5.05.13 of this <br />Agreement and included as part of the Wholesale Revenue Requirement. For rate setting <br />purposes, estimated Project operation and maintenance expenses shall be used as set forth in <br />25 <br />15118728.1 <br />374 <br />
The URL can be used to link to this page
Your browser does not support the video tag.