Laserfiche WebLink
6.A. - Page 34 of 50 <br />DAC <br />Project name: ADA Self -Evaluation and Transition Plan <br />• DAC conducted an ADA self-evaluation and transition plan for City buildings, facilities, and parks. <br />• DAC has also assisted the City to successfully prepare and respond to a Caltrans audit. <br />• DAC also assisted the City to perform a self-evaluation of services, policies, programs and practices. <br />• DAC is providing ongoing, as needed additional consultation such as plans review. <br />• The City is currently using DACTrak to implement their transition plan. <br />Project completion: 2017 <br />Estimated Cost prior to contracting: $147,325 <br />Completed Project cost: $147,325 <br />Section 7 — Cost Proposal <br />As requested in the RFP, DAC has provided a Cost Proposal as a separately sealed document from the technical <br />portion of the proposal. <br />Section 8 — Schedule <br />Based on experience with similar projects, it is estimated that the project completion time will be about eight <br />(8) months. <br />Scope of Service —Activity or Task <br />Months <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />DAC Team Meeting with City of Redwood City; kick- <br />off meeting; survey methodologies, deliverables and <br />schedule confirmation <br />Project Planning, Survey and Activity Scheduling, <br />Procedures Review <br />Inspections of City Buildings, Parks, Parking Areas, <br />Sidewalks and Intersections <br />Field Inspection Data Compiled (compiled on a daily <br />basis and available for review throughout the <br />inspection process) <br />Review of Policies and Procedures; analysis of <br />existing plan <br />Advertisement for Public Input, comments collected <br />and compiled <br />DAC Response to the City of Redwood City for ADA Consulting Services <br />11 <br />40 <br />