My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-01-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-01-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:35:29 AM
Creation date
1/24/2019 4:28:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.G. - Page 149 of 238 <br />Lake Merced Pump Station), the source water is from the Sunset Reservoir (not the <br />County -line), and the direction of flow through the Sunset venturi meter is reversed. <br />Under this pumping scenario, the recording instrumentation on the Sunset and Sutro <br />venturi meters are designed to not record flow on their respective recorders such that <br />the in -City transfer of water between Sunset and Sutro Reservoirs is not included as a <br />County -line delivery to the City. Figure 2 provides a generalized schematic of the <br />Lake Merced Pump Station and the typical direction of flow from the County -line, <br />through the pump station. <br />(2) County -line deliveries to Lake Merced <br />In order to raise and maintain water levels in Lake Merced, the SFPUC occasionally <br />delivers water directly from the Regional Water System to Lake Merced. Deliveries <br />from the Regional Water System to Lake Merced are accomplished at the Lake <br />Merced Pump Station. The procedure involves operating valves on the suction side <br />of Sunset Pump No. 2 such that water may flow by gravity in the Sunset Supply <br />Pipeline, from San Mateo County, across the County -line and into San Francisco, <br />through Lake Merced Pump Station and into the Lake Merced wet well. A 16 -inch <br />pipeline connection on the suction side of Sunset Pump No. 2 allows for deliveries of <br />water to the wet well (see Figure 2). Water deliveries from the Regional Water <br />System to Lake Merced are considered County -line deliveries and an in -City usage in <br />the calculation of water allocation rates. <br />b. In -City Terminal Reservoirs <br />Water usage by the City includes water deliveries from the SFPUC's "terminal <br />reservoirs." The terminal reservoirs are: 1) Sunset Reservoir, 2) University Mound Reservoir, <br />and 3) Merced Manor Reservoir. The terminal reservoirs are shown on Figure 1. <br />C. System Input and In -Line Meters <br />0 <br />March 11, 2009 <br />a:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.