My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-01-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-01-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:35:29 AM
Creation date
1/24/2019 4:28:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.G. -'Page 163 of 238 <br />The SFPUC will contract with an independent metering consultant to perform. periodic <br />inspections, testing, servicing and calibrations of the meters and metering equipment for the <br />County -line meters and In -City Terminal Reservoirs. The metering consultant's calibration and <br />maintenance work will include the following components:. <br />• Annual Pitot Tube Tests: Pitot tube flow tests shall be performed once a year on all <br />Venturi -type flow meters. See Sections 4.b and 4.c for further detail. <br />• Quarterly Secondary Meter Equipment Testing and Calibration: The secondary metering <br />equipment shall be tested for accuracy and calibrated quarterly at five input levels (0%, 25%, <br />50%,.75% and 100% of the full range of flow). See Section 4.a for further detail. <br />• Cleaning: Clean and remove dust, oils, dirt, etc. from all instruments. <br />• Flushing: Flush and clean Venturi tube differential pressure (D/P) sensing lines. <br />• Inspecting: Inspections for mechanical fatigue, leaky pipes and fittings, worn parts, and <br />improper operation of electrical/electronic equipment. <br />• Lubrication: Mechanical parts shall be lubricated as needed. <br />4. Calibration Procedures <br />The metering consultant shall continue to calibrate and maintain the County -line meters <br />and metering equipment listed in Table 4 in accordancewith the frequency of work specified in <br />Table 5. The work includes documenting meter readings and accuracy before and after <br />calibration. Specific tasks to be completed by the metering consultant are as follows: <br />a) Quarterly testing and calibration. The secondary metering equipment shall be tested and <br />calibrated quarterly using NIST Traceable test equipment, and a "dead weight tester." <br />18 <br />March 11, 2009 <br />E& <br />
The URL can be used to link to this page
Your browser does not support the video tag.