Laserfiche WebLink
6.G. - Page 198 of 238 <br />ATTACHMENT L-2 (CONTINUED) <br />WATER ENTERPRISE REVENUE BOND 7006 SERIES A <br />SUMMARY OF SOURCES AND USES OF FUNDS <br />(Section 5.04) <br />Miscellaneous <br />PEIR <br />PPPCMS Services <br />Watershed Land Acquisition <br />Total Miscellaneous <br />LLNL <br />Bay Division Subregional <br />Seismic Upgrade BDPL 3 & 4 <br />BDPL Reliability <br />BDPL 3 & 4 Crossover <br />SCADA Phase II <br />EBMUD Intertie <br />BDPL 4 Slipline <br />Total Bay Division Subregional <br />Peninsula Subregional <br />Capuchino Valve Lot <br />CS/SA Transmission <br />Adit Leak Repair <br />HTWTP Short Term <br />Cross Connection Control <br />CS Bypass Tunnel <br />LCS Dam Improvement <br />Pulgas Balancing Reservoir <br />HTWTP Long Term <br />Baden & San Pedro Valve Lots <br />Total Peninsula Subregional <br />San Francisco Subregional <br />CSPL 2 Replacement <br />SAPL 3 <br />Desalination <br />Total San Francisco Subregional <br />Grand Total <br />Regional <br />Local <br />3,204,177.44 5,103,872.56 <br />2,964,786.31 10, 358,811.69 <br />502,660.00 <br />6,168,963.75 15,965,344.25 <br />133,156.60 <br />4,758, 306.54 <br />4,360,664.44 <br />802,494.94 <br />65,497.37 <br />.6,668,906.37 <br />16,655,869.66 <br />162,584.69 <br />2,288,853.10 <br />255,334.99 <br />2,874,763.69 <br />1,150,559.48 <br />2,873,475.22 <br />931, 587.07 <br />1,218, 341.39 <br />1,107,185.77 <br />60,203.48 <br />12,922,888.88 <br />1,269,111.95 <br />1,492, 584.40 <br />55,618.10 <br />2,817,314.45 <br />282,702.40 <br />16,481,539.46 <br />40,874,800.56 <br />493, 817.06 <br />1,247,963.63 <br />4,075,015.63 <br />1,219,251.00 <br />64,392,387.34 <br />753,779.31 <br />3,448,975.90 <br />1,650,368.01 <br />3, 582, 860.31 <br />324, 549.52 <br />15,532,584.78 <br />3,278,932.93 <br />2,706,284.61 <br />2,549,793.23 <br />2, 963, 540.52 <br />36,791,669.12 <br />5,019,824.05 <br />1,942,479.60 <br />596,473.90 <br />7,558,777.55 <br />8,308,050.00 <br />13,323,598.00 <br />502,660.00 <br />22,134,308.00 <br />415,859.00 <br />21,239, 846.00 <br />45,235,465.00 <br />1,296,312.00 <br />1,313,461.00 <br />10, 743, 922.00 <br />1,219,251.00 <br />81,048,257.00 <br />916, 364.00 <br />5,737,829.00 <br />1,905,703.00 <br />6,457,624.00. <br />1,475,109.00 <br />18,406,060.00 <br />4,210,520.00 <br />3,924,626.00 <br />3,656,979.00 <br />3, 023, 744.00 <br />49,714,558.00 <br />6,288,936.00 <br />3,435,064.00 <br />652,092.00 <br />10, 376, 092.00 <br />120,622,352.19 359,746,902.82 480,369,255.01 <br />328,140,295.00 68.31% <br />152, 228, 960.01 31.69% <br />480,369,255.01 <br />This certificate is for illustration only. It was prepared in 2006 and shown <br />groundwater and recycled water projects as regional instead of local. In <br />addition, it does not reflect expenditures for the portions of regional assets <br />which in rate base as of June 30, 2008 nor what is expected to be added to <br />rate base through June 30, 2009. For these reasons, the percentages shown <br />for regional and local projects are not accurate. <br />Page 2 of 2 <br />529 <br />