Laserfiche WebLink
6.G. - Page 225 of 238 <br />ATTACHMENT R-2 <br />SPECIAL CLASSIFICATION OF DISCRETE PROJECTS FOR <br />2018 WSA AMENDMENT PURPOSES <br />Asset <br />Asset <br />Project <br />Project <br />Classification <br />Classification' <br />Lower Cherry <br />Joint <br />Lower Cherry Aqueduct Project <br />Water <br />Aqueduct <br />Mountain Tunnel <br />Joint <br />Mountain Tunnel Interim Work <br />Water <br />Mountain Tunnel <br />Joint <br />Mountain Tunnel Long Term <br />Water <br />Repairs <br />Mountain Tunnel <br />Joint <br />Mountain Tunnel Flow Control <br />Joints <br />Facility (FCF) Project <br />Kirkwood Penstock <br />Power <br />Kirkwood Penstock Project <br />Joint' <br />Moccasin Powerhouse <br />Power <br />Moccasin Penstock Project <br />Joint' <br />Penstock <br />Moccasin Lower Dam <br />Water <br />Moccasin Dam Interim Repairs <br />Joints <br />Moccasin Lower Dam <br />Water <br />Moccasin Dam Long -Term <br />Joint' <br />Improvements <br />These Project Classifications are Exceptions to the Fixed Asset Classifications in <br />Attachment R-3 <br />Attachment R-3 lists major Hetch Hetchy Enterprise Existing System Assets and their agreed- <br />upon classifications (Power, Joint or Water). The classification for all Existing System Assets is <br />fixed and applies to all related expenditures, including capital, regulatory, operating and <br />maintenance expenses, and whether the expenditure alters, rebuilds or replaces the asset, and <br />any appurtenances. <br />Expires June 30, 2034 <br />2 Project capital costs may include costs incurred in FY 2013-14 and subsequent Fiscal Years <br />until project is complete <br />3 Project capital costs may include costs incurred in FY 2011-12 and subsequent Fiscal Years <br />until project is complete <br />' Project capital costs may include costs incurred in FY 2009-10 and subsequent Fiscal Years <br />until project is complete <br />5 Project capital costs may include costs incurred in FY 2017-18 and subsequent Fiscal Years <br />until project is complete <br />15048734.1 <br />556 <br />