My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-01-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-01-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:35:29 AM
Creation date
1/24/2019 4:28:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/28/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
1/24/2019 4:32 PM
Modified:
1/24/2019 4:32 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.H. - Page 3 of 7 <br />The apparent low bid was determined by the Base Bid. The total base bid of $86,207.50 from Golden <br />Bay Construction, Inc. is 8% higher than the engineer's estimate of $60,000-$80,000. Based on bids <br />received, staff believes that the low bid is reasonable and recommends awarding the contract to Golden <br />Bay Construction, Inc. <br />In addition to the base bid work, staff recommends to include two additional alternate work items that <br />were included within the request for bids. The first additional work item includes of the installation of a <br />pedestrian push-button activated rectangular rapid flashing beacon at the Hopkins/Lowell intersection, <br />at the bid price of $5,334. The second additional work item includes changing the "Hopkins -Alameda <br />connector" street to be one-way, allowing only westbound Hopkins traffic to flow to northbound <br />Alameda de las Pulgas. This part of the project also includes alterations to the existing triangular median <br />at the Hopkins/Alameda intersection, which would allow for a dedicated left turn lane from southbound <br />Alameda to eastbound Hopkins. The bid price for this work was $70,027. The total bid amount for the <br />base bid plus two additional alternate work items is $161,568.50. <br />In conjunction with the work done under this contract, City crews will be installing rubber curbing to <br />pilot the median islands and curb extensions ("bulb -outs"). <br />The pilot is anticipated to be installed for a period of 3-4 months, beginning in March of 2019. Residents <br />and other interested parties will be notified of the construction at least two weeks ahead of the work <br />through the following methods: placement of mobile signs in the neighborhood; updates to the project <br />website; NextDoor communications; direct email notification to those on the interested parties list; and <br />a physical letter distributed to the surrounding area. Data collection and community input will be <br />gathered after the initial two months of installation, through the use of both paper and online survey <br />tools. Staff will bring the data analysis and community feedback to the Complete Streets Advisory <br />Committee (CSAC) after the conclusion of the pilot, along with any recommended changes due to <br />community feedback. CSAC will then provide direction on whether or not to pursue design of the <br />permanent installation of the proposed measures. If a permanent installation is recommended, the <br />project will be brought to the City Council prior to award of the contract for that work. <br />Notification of when the project is planned to be on the CSAC agenda will be distributed to residents and <br />other interested parties through the same methods as mentioned above, and the project website will <br />maintain the most current project plans for public viewing throughout the process. <br />FISCAL IMPACT <br />Funding for this project is included in the Fiscal Year 2018-19 Engineering Division budget. <br />ENVIRONMENTAL REVIEW <br />The project is categorically exempt from the requirements of the California Environmental Quality Act <br />(CEQA) Guidelines per Section 15306 because the purpose of the project is to collect data to evaluate <br />the project's impact on traffic operations, safety, and livability. <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />572 <br />
The URL can be used to link to this page
Your browser does not support the video tag.