Task 2: Microsimulation Model Development <br />Consultant will develop a VISSIM microsimulation model that incorporates all modes of travel, including <br />automobiles, trains, buses, bicycles, and pedestrians. This task includes AM and PM peak hours VISSIM <br />simulation models for the triangle study area with cumulative movement volumes (Task 1), existing lane <br />geometries, intersection spacing, and signal timing to develop the "No Project' analysis network. <br />Consultant will produce network -wide evaluation metrics, including AM and PM peak hour travel time <br />estimate along EI Camino Real and Main Street, network -wide delay, conflicting points for bicycles and <br />pedestrians, person throughput, and delay by travel mode. <br />Task 3: Alternatives Testing <br />The multi -modal simulation model will study the following roadway modifications and will adjust the <br />cumulative forecasts to reflect proposed modifications, as appropriate: <br />• Signal at Main Street/Redwood Avenue and EI Camino Real (full access) <br />• Up to two geometry modifications at the Woodside Road/ Main Street intersection <br />• Realign Cedar Street to line with Roosevelt Avenue <br />• Realign Beech Street to line with Lincoln Avenue <br />• Closure of Lathrop Street between Chestnut Street and EI Camino Real <br />• Closure of Lathrop Street between Cedar Street and EI Camino Real <br />• Closure of one of the railroad crossings at Maple Street, Main Street, or Chestnut Street <br />Consultant will combine these modifications to develop three different alternative models, as described <br />below: <br />1) No Build Alternative includes the cumulative forecasts with the existing roadway geometry <br />2) Build 1 Alternative includes the following roadway modifications: <br />a. Signal at Main Street/Redwood Avenue and EI Camino Real, <br />b. Realign Cedar Street with Roosevelt Avenue, <br />c. Realign Beech Street with Lincoln Avenue, <br />d. Signal at Main Street/ Westbound Woodside Road, <br />e. Closure of Lathrop Street between Cedar Street and EI Camino Real, and <br />f. Closure of Maple Street at the railroad crossing <br />3) Build 2 Alternative will be further refined once the results of the Build 1 Alternative are shared <br />with the City. The City will select which group of improvements to be analyzed as part of the Build <br />2 Alternative. <br />Consultant will analyze the closing at least one of the railroad crossings between the South Main Street <br />project (study area) and the downtown in order to reduce the number of at grade railroad crossings. <br />Currently, the Build 1 Alternative includes the closure of the Maple Street crossing and will qualitatively <br />discuss the closures of the two other crossings at Main Street and Chestnut Street. <br />ATTY/AGR/2019/AMENDMENTS/AMEND NO. 1- AECOM <br />REV: 06-17-19 PR <br />Page 14 of 22 <br />