My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Aecom Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Aecom Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2020 12:15:28 PM
Creation date
1/25/2019 12:09:05 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Aecom Technical Services, Inc
PROJECT NAME
Environmental consulting 1601 ECR
RMP File Number
304
Date
1/9/2019
MO Ref
18-237
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Appendix 5: Utilities Evaluation <br />Page 17 <br />that are assigned to pipelines within the Project area in the hydraulic model should be adjusted <br />based on the calibration results. If the pipeline roughness coefficients in the Project area need <br />to be adjusted, Consultant will use the field data to determine the roughness coefficients. <br />Results of the calibration will be presented in the report. The final calibrated hydraulic <br />model will be submitted to the City as an EPANET file. <br />• Perform Hydraulic Evaluation for Maximum Day Plus Fire Flow Conditions: Conduct a fire <br />flow analysis to determine available fire flows in the project area under existing conditions <br />(existing conditions in the current water system hydraulic model) and for water system <br />buildout conditions with the Project demands. Fire flow requirements will be provided by <br />the applicant based on the Redwood City Fire Department. If available fire flows at buildout <br />of the system are less than the required demand with the Project demand included, <br />Consultant will identify potable water system improvements within the project area to meet <br />fire flow requirements. Consultant will prepare a map showing pre- and post -project fire <br />flow rates at each hydrant in the project area. <br />• Perform Hydraulic Evaluation for Normal Operations, Peak Hour Demand Conditions: <br />Perform a peak hour demand evaluation for existing conditions (existing conditions in the <br />current water system hydraulic model) and for potable water system buildout conditions <br />including Project demands, to determine the hydraulic impact of the Project on the City's <br />existing Main Zone water system. If a significant impact to water service performance in <br />the nearby area is determined by the City, Consultant will identify potable water system <br />improvements to the existing system within the nearby areas to improve water system <br />performance. Utilize the City's hydraulic design criteria for normal operation conditions <br />that are documented in the City's 2011 Water Master Plan. Consultant will prepare a map <br />showing pre- and post -project water pressures at each hydrant in the project area. <br />Task 1. City Data Requirements: <br />• Potable water demands for the Project area for existing and buildout conditions. <br />• Hydrant test data for C -factor adjustment. <br />• Data for estimating the Main City pressure zone demands. <br />• Flow rates and pressure information at the SFPUC turnouts. <br />Task 2. Evaluate Recycled Water System <br />Consultant will perform a recycled water system analysis to determine recycled water <br />infrastructure requirements to serve the Project development. Pressure and flow results will be <br />shown clearly on maps. Final model files will be submitted to the City in EPAnet format. The <br />following work will be performed: <br />• Update the Hydraulic Model: Update the City's existing recycled system hydraulic model <br />to include proposed pipelines identified in the Preliminary Utility Study, and to allocate <br />irrigation and dual -demands provided by the City for the Project area, other Greystar <br />development areas, Kaiser, and Sobrato. Note that both irrigation and dual -plumbing <br />demands on the site, the night-time irrigation loading may control. <br />• Perform Hydraulic Evaluation for Peak Hour Irrigation Demand Conditions: Perform a <br />peak hour demand evaluation for the recycled water system at buildout conditions with the <br />ATTY/AGR/2019/AMENDMENTS/AMEND NO.1-AECOM <br />REV: 06-17-19 PR <br />Page 17 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.