My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-02-11 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-02-11 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:30:18 AM
Creation date
2/7/2019 5:10:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/11/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/AGR.2O19.O12/Woodard & Curran <br />6.B. - Page 25 of 28 <br />EXHIBIT A-1 <br />Comprehensive Sanitary Sewer Modeling, Capacity Assessment and Master Planning <br />Proposed Project Schedule <br />Task 1: Project Management & Quality Control <br />1.1 Project Administration <br />1 - 2 Progress Meetings, Phone Calls, emails <br />1.3 Project QA1QC Activities <br />Task 2: Review Exisiting Information <br />Task 3: Flow Monitoring <br />Task 4: Develop Land Use Planning Information & Parcel Loads <br />4.1 ReviewPlanningDocumentsand Meetwith Planning Staff <br />4.2 Develop Parcel Loads <br />4.3 Develop Large User Loads <br />Task 5: Develop Design Flow and Hydraulic Criteria <br />5.2 Develop Hydraulic Criteria <br />5.3 Meeting with Selected City Staff <br />5.4 Prepare TM <br />Task 6: Develop Hydraulic Model <br />6.2 Construct and Validate Model Network Database <br />6.3 Delineate and Populate Subbasins and Loadings <br />6. <br />Task 7: Evaluate System Hydraulic Performance <br />7.2 Develop and Model Preliminary Solutions <br />Task 6: Develop Capacity Relief Projects <br />Task 9: Develop Sewer System Capital Improvement Program <br />9.1 Develop Cost Criteria <br />9.2 Prepare Cost Estimates <br />9.3 Develop Project Rankings <br />9.4 Develop Capital Improvement Program <br />9.5 Meeting with Selected City Staff <br />Task 10: Prepare Master Plan Report <br />10.1 Prepare Draft Report <br />10.2 Meeting with Selected City Staff <br />10.3 Prepare Final Report <br />Task 11: Optional Services (if authorized by City) <br />⢠Council award Fâ*â] Task meeting or teleconference TM Technical Memorandum ODraft Master Plan report OP Final Master Plan report <br />REV: 01-28-19 PR <br />12/47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.