Laserfiche WebLink
6.D. - Page 10 of 22 <br />ADDITIVE ALTERNATE NO.1 BID SCHEDULE: HDPE WATER TRANSMISSION LINE AND <br />APPURTENANCES* <br />Item <br />Description <br />Quantity <br />unit <br />Unit Price <br />Item Cost <br />Mobilization, Demobilization, Traffic <br />I <br />Control, Construction Layoui, <br />Nof kation & Incidentals (Maximum <br />1 <br />LS <br />l <br />! <br />/ 000 <br />! <br />5% of the Total Additive Alternate <br />f <br />No.1 Bid, Items 1 through 12 <br />Sheeting, shoring and bracing for all <br />trenching and excavation work in <br />accordance with California Labor Code <br />1 <br />LS! <br />Y <br />Section 6707. <br />3 <br />Water Main -12-inch DR 11 IPS HDPE <br />Pipe <br />900 <br />LF <br />Z <br />� <br />4 <br />Butterfly Valve -12-inch <br />3 <br />EA <br />5 <br />Gate Valve - 64nch <br />2 <br />EA <br />�. �O <br />�, 0_'? <br />6 <br />Comb. Air Valve wlEnclosure - 24nch <br />2 <br />EA <br />1 �' fie' <br />�F�j Z!!%-'9 <br />7 <br />Comb. Air -Valve w/Enclosure -1-inch <br />1 <br />EA <br />0 z2 9, <br />c20.1) <br />8 <br />Blow Off - 2 -inch <br />1 <br />EA <br />S L v-) <br />j <br />600 <br />9 <br />Thrust Block for HDPE Pipe <br />8 <br />EA <br />'� 4- / <br />2, <br />10 <br />Trench Stabilizer (RWC Std W-19) <br />10 <br />EA <br />? � (2 <br />L <br />11 <br />Pipeline Connection, Sta. 10+00 <br />1 <br />LS <br />12 <br />Communication Conduit and <br />940 <br />LF <br />l0 � <br />Appurtenances I <br />TOTAL ADDITIVE ALTERNATE NO. 1 <br />BID SCHEDULE <br />2� <br />ITEMS 1 <br />THROUGH 12 ($) <br />* SEE DRAWINGS G-2, C-10, C-11, AND C-12 FOR WORK DELINIATION <br />010 FORMS 00400.4 <br />CAUFORNEA WATER TANK, PUMP STATION & TRANSMISSION MAIN PROJECT <br />97 <br />