Laserfiche WebLink
<br /> . <br /> CATALYSTfrom Richman <br /> WAYFINDING PROGRAM: CONSTRUCTION DOCUMENTS PHASE <br /> Professional Service Budget <br /> SUMMARY <br /> March 06 (additional services- time-and-expenses) 6,813 <br /> Proposed Wayfinding Construction Documents 31 ,340 <br /> Bectrical engineering: Parking Structure Sign Qf necessary) 4,000 <br /> Prototype Fabrication and Installation 7,500 <br /> Total Proposed Contract Amount 49,653 <br /> includes: <br /> VKK Signmakers custom bracket design and prototype fabrication <br /> Keng's Design limited consultation and review <br /> Engineering of sign post footings <br /> (does not include construction documents for Theatre Way II) <br /> . <br /> ..... ....~- <br />