My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-02-25 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-02-25 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:15:52 AM
Creation date
2/21/2019 5:32:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/25/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
39 <br />$'Perfo nn e S eof r77 <br />The performance measure matrix, presented to the <br />right, uses performance measures developed for <br />this project based on the GBI Guiding Principles and <br />feedback from the City.The purpose is to highlight <br />the strengths and weaknesses of conceptual design <br />elements at the intersection level and illustrate how <br />site-specific improvements on the corridor will help <br />reach the overall goals of the project and the Grand <br />Boulevard Initiative. <br />O©©O© <br />Score Keyw� Be� <br />V <br />In <br />5 4� <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />L5 5-A <br />© O <br />© O <br />H4.0 <br />4.0 <br />Protected Intersection <br />Maple Street <br />New Signalized Crosswalk (South Leg) <br />Right Turn Pocket Removal (NB) <br />• Median Extension <br />Beech Street/ <br />Raised Bicycle Crossing <br />Lincoln Ave <br />• Protected Corner <br />Pedestrian Hybrid Beacon <br />• Right Turn Pocket Removal (SB) <br />Protected Intersection <br />Roadway Re -Alignment <br />Roosevelt Ave <br />Right Turn Pocket Removal (SB) <br />New Signalized Crosswalk (North Leg) <br />Leading Pedestrian Interval (LPI) <br />Chestnut <br />Median Extension <br />Street <br />•Signal Removal <br />Raised Bicycle Crossing <br />Lathrop <br />Pedestrian Hybrid Beacon <br />Slip -Lane Removal <br />Street <br />Protected Corner <br />Pine Street <br />• Raised Bicycle Crossing <br />Through/Right Turn Pocket Removal (SB) <br />Oak Ave <br />• Leading Pedestrian Interval (LPI) <br />Protected Corner <br />Roadway Realignment <br />Main St/ <br />New Signal Added <br />Redwood Ave <br />•Slip -Lane Removal <br />• Separate Right Turn Phase <br />Woodside <br />•ImprovedLighting <br />Road <br />Barrier for Pedestrians on Sidewalk <br />Underpass <br />• Removal of Southbound Receiving Lane <br />from Slip Lane <br />Manzanita <br />Street, Willow <br />Street, and <br />•Shared Right Turn Zone <br />Hemlock <br />Avenue <br />Slip -Lane Removal <br />Laurel Street <br />Protected Corners <br />/ Hazel Ave <br />Pedestrian Hybrid Beacon <br />(Optional, Not Scored) <br />Charter <br />New Signalized Crosswalk (North Leg) <br />Street <br />• Leading Pedestrian Interval (LPI) <br />Shared RightTum Zone <br />V <br />In <br />5 4� <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />L5 5-A <br />© O <br />© O <br />H4.0 <br />4.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.