My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Woodard & Curran
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Woodard & Curran
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2025 2:11:33 PM
Creation date
2/25/2019 4:17:55 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Woodard & Curran
PROJECT NAME
PSA for comprehensive Sanitary Sewer Master Plan
RMP File Number
304
Date
2/14/2019
MO Ref
19-022
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B-2 <br />Hourly Rates WOODARD <br />&CURRAN <br />2919 Rates <br />Labor Category <br />Rate <br />Engineer (E1) <br />162 <br />Scientist 1 (S1) <br />Geologist (G1) <br />Planner (P1) <br />Technical Specialist 1 (TS 1) <br />Engineer 2 (E2) <br />187 <br />Scientist 2 (S2) <br />Geologist 2 (G2) <br />Planner 2 (P2) <br />Technical Specialist 2 S2 <br />Engineer 3 (E3) <br />212 <br />Scientist 3 (S3) <br />Geologist 3 (G3) <br />Planner 3 (P3) <br />Technical Specialist 3 TS3 <br />Project Engineer 1 (PE 1) <br />221 <br />Project Specialist 1(PS1) <br />Project Geologist 1 (PG1) <br />Project Planner 1 (PP1) <br />Project Technical Specialist 1 PTS1 <br />Project Engineer 2 (PE2) <br />236 <br />Project Specialist 2 (PS2) <br />Project Geologist 2 (PG2) <br />Project Planner 2 (PP2) <br />Project Technical Specialist 2 TS2 <br />Project Manager 1 (PM1) <br />251 <br />Technical Manager 1 TM1 <br />Project Manager 2 (PM2) <br />266 <br />Technical Manager 2 TM2 <br />Senior Project Manager (SPM) <br />275 <br />Senior Technical Manager STM <br />Senior Technical Practice Leader STPL <br />290 <br />National Practice Leader (NPL) <br />290 <br />Strategic Business Unit Leader SBUL <br />Software Engineer 1 (SE1) <br />147 <br />Software Engineer 2 (SE2) <br />170 <br />Designer 1 D1 <br />125 <br />Designer 2 D2 <br />155 <br />Designer 3 (D3) <br />160 <br />Senior Software Developer SSD <br />Senior Designer SD <br />165 <br />Project Assistant PA <br />110 <br />Marketing Assistant (MA) <br />118 <br />Graphic Artist GA <br />Senior Accountant (SA) <br />129 <br />Senior Project Assistant <br />Billing Manager BM <br />Marketing Manager (MM) <br />149 <br />Graphics Manager GM <br />Note: The individual hourly rates include salary, overhead and profit. Other direct costs (ODCs) such as reproduction, delivery, <br />mileage (as allowed by IRS guidelines), and travel expenses will be billed at actual cost. Subconsultants will be billed as actual <br />cost plus 10%. <br />a:F69.012/Woodard & Curran 12119/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.