Laserfiche WebLink
<br />EXHIBIT "A" <br /> <br />.~ <br />:.:a <br />Bkf <br /> <br />May 31, 2006 <br />BKF No. 20050129 - 10 <br /> <br />ENGINEERS <br /> <br />SURVEYORS <br /> <br />PLANNERS <br /> <br />Mr. Paul Willis <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, CA 94064 <br /> <br />Subject: <br /> <br />Feasibility Study of Modifying Fifth Avenue Pump Station <br /> <br />Dear Paul: <br /> <br />City of Redwood City is interested in the possibility of modifying the existing Fifth <br />Avenue Pump Station by installing a larger pump within the existing pump station pit. <br />Portion of the structure has been evaluated by BKF in the past. The proposed feasibility <br />study will include: a simple letter type report, research of the existing structure, <br />evaluation of installing larger pump, and electrical panel configuration. The total cost of <br />the above mentioned work will be for the not to exceed price of$17,500.00 <br /> <br />Once again, we would like to thank the City for the opportunity to complete the first <br />phase of the pump station discharge structure construction, and we look forward to <br />working with you on the evaluation of installing of larger pump in the existing pump <br />statÌöffstrutt1lte and the þössìbilíty of modifying the existing electrical panel for a larger <br />pump. <br /> <br />Very truly yours, <br />BKF ENGINEERS <br />, <br /> <br />~ 7~'&~~ <br /> <br />Michael C. Liu, PE <br />Senior Project Manager <br /> <br />.-7 ~ ~ \ <br /> <br />~..L-. <br /> <br />255 Shoreline Drive <br />Suite 200 <br />Redwood City <br />California 94065 <br />phone 650.482.6]00 <br />fax 650.482.6]99 <br />www.bl<fcom <br />