Laserfiche WebLink
<br />. <br /> <br />DV AGRCP3. ocx: <br />August 26, 1996 <br /> <br />(i) <br /> <br />(ii) <br /> <br />(iii) <br /> <br />(i v ) <br /> <br />(v) <br /> <br />Pennit construc:tion at any point on Lot 7 as shown on the <br /> <br />Vesting Tentative Map to be at elevation + 101 (NGVD 192~ + 100 <br /> <br />feet) but no lower; <br /> <br />Permit construction of the catch basin grates at éll'l'r-opriate <br /> <br />points on the Property to be at elevation + 101.5 (NGVI:> 1929 <br /> <br />+ 100 feet) but no lo,^,er; <br /> <br />Permit construction of the céltch basin gutters within the <br /> <br />right-of-wélJ' for the Shoreline Drive extension élt elevéltion <br /> <br />+ 102.5 (1'JGVD 1929 + 100 feet); <br /> <br />",. " <br />,,-,"..' <br /> <br />Permit the connection of gravity storm drainage facilities from <br /> <br />.. ..... <br />:::~: .. <br /> <br />. , . , <br />.. .' <br />..,_.." <br />..,~,..", <br /> <br />the Pr-oper-ty to the pr-oposed storm drainélge facilities to be <br /> <br />.. " ., <br />" .".. <br />:::~"':~ <br /> <br />,::::..~~. <br />:~ :: : : <br />~:::~~~; <br /> <br />constructed within the Shoreline Drive extension; and <br /> <br />::I;~ <br /> <br />~~~~:L <br />:;::h;~: <br /> <br />Provide that the design of the storm drainage facilities on the <br /> <br />"' .." <br />,......-, <br />Ui} <br /> <br />Property is such that on the Pr°l'er-ty (except for Lot 7) during the <br /> <br />100-year storm event: <br /> <br />(A) <br /> <br />Ponding may reach but not at any time exceed 6 inches in <br /> <br />depth; <br /> <br />(B) <br /> <br />Ponding of any depth may remain for up to one hour but <br /> <br />no longer; and <br /> <br />(C) <br /> <br />No unreasonable hazard, as dètermined by City, is . <br /> <br />presented to pedestrians. <br />/ <br /> <br />-20- <br /> <br />'" ...- .~'".. ",,' . ,. -~.~...'" ,'.. , <br />