My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-03-11 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-03-11 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:00:49 AM
Creation date
3/7/2019 5:55:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/11/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.C. - Page 94 of 121 <br />LIABILITY, and caused by accidents under SECTION I — COVERAGE C MEDICAL PAYMENTS, which <br />cannot be attributed only to ongoing operations at a single designated construction project shown in the <br />Schedule above: <br />1. Any payments made under SECTION I — COVERAGES, COVERAGE A BODILY INJURY AND <br />PROPERTY DAMAGE LIABILITY for damages or under SECTION I — COVERAGE C MEDICAL <br />PAYMENTS shall reduce the amount available under the General Aggregate Limit or the Products - <br />Completed Operations Aggregate Limit, whichever is applicable; and <br />2. Such payments shall not reduce any Designated Construction Project General Aggregate Limit. <br />C. When coverage for liability resulting from the "products -completed operations hazard" is provided, any <br />payments for damages because of "bodily injury" or "property damage" included in the "products - <br />completed operations hazard" will reduce the Products -Completed Operations Aggregate Limit, and not <br />reduce the General Aggregate Limit nor the Designated Construction Project General Aggregate Limit. <br />D. If the applicable designated construction project has been abandoned, delayed, or abandoned and then <br />restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications <br />or timetables, the project will still be deemed to be the same construction project. <br />E. The provisions of SECTION III — LIMITS OF INSURANCE not otherwise modified by this endorsement <br />shall continue to apply as stipulated. <br />ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED. <br />UCG2503-1013 Includes copyrighted material of Insurance Services Office, Inc., 1996 Page 2 of 2 <br />with its permission. <br />119 <br />96791808 1 BAYAR-9 1 18/19 — PER PROJECT I MaryAnn Worman 1 1/28/2019 9:39:16 PM (PST) I Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.