My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-03-11 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-03-11 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:00:49 AM
Creation date
3/7/2019 5:55:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/11/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.C. - Page 37 of 121 <br />d. Damage to existing structures, facilities, trees, lawns, shrubs, pavements, or other <br />property caused by the Contractor shall be restored to original condition at the <br />Contractor's expense, prior to final inspection and acceptance. <br />e. In the event that Street Trees or their roots have been damaged, the Contractor shall be <br />subject to the penalty rate of $100 per inch of damage. Measurement of the damage <br />shall be the width of the wound measured across the grain at the widest point. Penalty <br />fee shall be paid to the City and deposited to the Tree Planting Fund. Reduction of an <br />invoice to offset penalty fee is not allowed. In any instance, should the damage to the <br />tree be evaluated to be a total loss where the tree is found to be dead, structurally <br />unsound, or unstable, the Contractor shall be responsible for the full value of the tree <br />as determined by the project manager. <br />f. The Contractor shall be responsible to make sure there is no illicit discharge into the <br />storm drain system at any time at work sites. <br />ATTACHMENT B - BID PRICING <br />Prices are all-inclusive and include but are not limited to travel, mobilization, traffic control, materials, <br />trucks, labor, notifications, etc. �;z_ / G /1 �� 4 c-� <br />Fill out the Price and Contractor's informntinn helnw in fiill <br />'� <br />i Rein <br />E5T RtY. <br />Unit <br />Unit Price <br />PiFil�e ., <br />yt <br />REMOVE AND REPLACE 4" CONCRETE <br />10,000 <br />SF <br />$ <br />l 7• d <br />$ <br />/ OJ V n <br />SIDEWALK <br />o <br />REMOVE AND REPLACE 6" CONCRETE <br />1,000 <br />SF <br />$ a0 <br />�• <br />$ <br />�� OOv, <br />SIDEWALK FOR DRIVEWAY ACCESS <br />REMOVE AND REPLACE RUBBER SIDEWALK <br />10,000 <br />SF <br />$ G , v p <br />$ D IJ p <br />REMOVE AND REPLACE EXISTING CONCRETE <br />3,000 <br />LF <br />$/$ <br />G <br />CURB AND GUTTER, INCLUDES 12" ASPHALT <br />d'_ <br />STRIP IN STREET <br />REMOVE AND REPLACE ASPHALT PAVEMENT <br />2,000 <br />SF <br />$ /6 64!> <br />AS DIRECTED <br />UTILITY TRENCH REPAIR <br />15,000 <br />SF <br />$ <br />$ <br />REMOVE AND REPLACE/CONSTRUCT ADA <br />RAMP PER <br />35 <br />EA <br />$D d <br />S/'57 <br />$ ` <br />d '� j'Ub <br />CALTRANS STANDARD DETAIL <br />REPAIR IRRIGATION SYSTEM <br />100 <br />LF <br />$ l a • U <br />$ / �bv. O <br />ADDITIONAL SUB -BASE EXCAVATION <br />SO <br />Cy <br />$ <br />�br Ui7 <br />2� �l1� r d <br />EXISTING DRAIN LINE REPLACEMENT <br />50 <br />EA <br />$ abs v <br />$ �� p vv v <br />REV: 12-14-18 PT <br />/ G Page 13 of 22 <br />ATTY/AGR.2018.282/Concrete/Asphalt Repair NIB updated 12.11.18 <br />AJF <br />
The URL can be used to link to this page
Your browser does not support the video tag.