My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Camp Dresser & McKee, In
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 Camp Dresser & McKee, In
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 10:55:45 AM
Creation date
6/29/2006 2:44:15 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Camp Dresser & McKee, Inc.
PROJECT NAME
Engineering Design Services
RMP File Number
304.5
Date
6/29/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Task 3 - Prepare Technical Memorandum <br />A brief technical memorandum will be prepared de~cribing the results from An.9.]y!;eg 9. 10 3nd <br />11. <br /> <br />Optional Services <br />CDM can perform additional services that could include the following. These optional services <br />would be performed only upon receipt of specific authorization from the City- <br /> <br />Part One <br />. Visits to constnlction sites. <br />. Additional design services <br />. Instrumentation and controls modification and improvements- <br />. Services after completion of construction, such as inspections during any guarantee <br />period and reporting observed discrepancies under guarantees. <br />. Preparing to serve or serving as witness for the City in any litigation, public hearing., or <br />other legal or administrative proceeding. <br /> <br />Pt1rl Two <br />. Additional Extran analyses. <br />. Modification of the SWMM link-node model. <br />. Additional meetings with the City staff. <br /> <br />Schedule <br />Part One - Per the City staffs verbal authorization, we have begun the Part One services and <br />will continue in accordance with the City's schedule and construction contractor's schedule. <br /> <br />Part Two - Work will begin within one week following authorization from the City. Task 1 <br />Analyses 9 and 10 can be completed within three weeks. Analysis 11 can be completed within <br />one week after the analysis parameters have been given to CDM by the City. Task 3 can b~ <br />completed within two weeks after the Task 2 meeting. <br /> <br />Compensation <br />Compensation for Part One and Part Two wi11 be on an hourly basis plus out-of-pocket expenses <br />as described on the anached Billing Rate Schedule. It is estimated that the level of effort in <br />performing Part One will be: <br /> <br />Task 1 <br />Task 2 <br />Task 3 <br />Task 4 <br />TOTAL <br /> <br />Preconstruction Conference <br />Inquiries and RequestS for Information <br />Revjew Shop Drawings <br />Prepare Record Drawings <br /> <br />$ 700 <br />$ 2,400 <br />$ 9,400 <br />$ 2500 <br />$15,000 <br /> <br />It is estimated that the level of effort in perfonning Part Two will not exceed $10,000. <br /> <br />The total for Parts One and Two wm not exceed $25,000. <br /> <br />COM <br /> <br />3 <br /> <br />WO61kf1OO3,do~ <br /> <br />88H <br /> <br />600/900"d <br /> <br />m-l <br /> <br />vll v££69Z6 <br /> <br />~99JJ ~nuleM ~aJ-~o~~ <br /> <br />~d89:£O <br /> <br />90-£Z-90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.