Laserfiche WebLink
nI <br />0 <br />6.13. - Page 51 of 77 <br />L <br />/111' MAXIMUM. - <br />SEE NOTE 3. <br />y <br />FLOATABLES WEIR. I A <br />I <br />PRIMARY BYPASS <br />BETWEEN FLOW THRU <br />TUBES. <br />FLOW THRU TUBES <br />INTO FILTER CHAMBER. <br />PERFORATED DRAIN -DOWN ` <br />FEED-THRU. 2X FLOW THRU <br />TUBES PER ASSEMBLY. <br />DETAIL A <br />INLET WEIR/BYPASS ASSEMBLY <br />& DRAIN -DOWN. <br />SCALE: NONE <br />2X 036.00' BOLTED & GASKETED ACCESS COVERS. <br />RISERS & SLAB T&G IMPRESSIONS AS REQUIRED. <br />FIELD POURED CONCRETE COLLAR REOUIiED, <br />BY OTHERS. SEE NOTE 2. <br />SEE DErAIL A <br />INLET WEIR/BWASS <br />ASSEMBLY. <br />018" MAXIMUM. <br />SEE NOTE 3.� <br />MINIMUM DEPTH <br />- RIM TO OUTLET INVERT - <br />CARTRIDGE STACK CONFIGURATION <br />12" 1 18" 112"+ 12" 12"+ 18" <br />425' 5.00 5.92' 6.67' <br />[51.00"] [60.00"] [71.007 [80.00"] <br />.75 [9.007 <br />DRAIN -DOWN DEVICE <br />SEE NOTE 4. <br />PERK FILTER' CARTRIDGE/STACKS. <br />-CARTRIDGE BYPASS PORT. <br />TREATED OUTLETS <br />CONCRETE FALSE FLOOPL <br />.110' [8.007 TYPICAL <br />WAIL THICKNESS. <br />0111' MAXIMUM. <br />SEE NOTE 3. <br />4.00' <br />[4&007 <br />A I 11.0o' <br />1 [60.007 <br />VENTED OUTLET <br />FROG. <br />MINIMUM DEPTH. <br />LJOL3Perk Fil ter TM 0 O1deaS'tle® <br />®®®Stormwater Solutions <br />4' Wide Concrete Vault 7921 SDWpe'k PIM. Suite 2001 Lftftb . CO 1801201 Ph: 8DOZM 8819 <br />THS DOmoff m THE PW <br />U9EDNMYWAYNIURMS• <br />FM L Three to Seven Cartridges/ Stacks DRAWING <br />•18" MAXIMUM. <br />SEE NOTE 3. <br />JPR 7/8/08 ISHEEr 2 OF 2I <br />BRFARROYO GREEN APARTMENTS- TOT-TTT BRADFORD STREET <br />IOaSTORM WATER OPERATION AND MAINTENANCE <br />YEARS EXHIBIT B (CON'T) <br />ENGINEERS . SURVEYORS . PLANNERS Drawn LP Checked CFG A roved CFG <br />1730 NORTH FIRST STREET., SUITE 600 (408) 467-9100 PP <br />SAN JOSE, CA 96112 www.bkf.com Job No. 20166073 Date 02/15/2019 Sheet 4 X64 <br />4' VAULT <br />TREATMENT FLOW RATES, TOTAL FLOW CAPACITIES & MAXIMUM HEAD LOSS <br />A CARTRIDGE STACK CONFIGURATION <br />CARTRIDGE DIMENSION 12" 18" 12"& 12" 12"& 18" <br />STACK -LENGTH- TREATMENT TOTAL FLOW TREATMENT TOTALFLOW TREATMENT TOTAL FLOW TREATMENT TOTAL FLOW <br />QUANTITY FLOW RATE CAPACITY FLOW RATE CAPACITY FLOW RATE CAPACITY FLOW RATE CAPACITY <br />ID -FE (GPM/CFS) (CFS) (GPM/CFS) (CFS) (GPM/CFS) (CFS) <br />3 <br />7 <br />36/0.08 2.9 <br />54/0.12 4.3 <br />72/0.16 5.0 <br />90/0.20 6.7 <br />72/0.16 4A <br />96/0.21 5.0 <br />120/0.27 6.8 <br />5 <br />9 <br />60/0.13 2.9 <br />90/0.20 4.4 <br />120/0.27 5.1 <br />150/0.33 6.8 <br />6 <br />11 <br />72/0.16 3.0 <br />108/0.24 4.5 <br />14410.32 5.1 <br />180 / 0.40 6.9 <br />7 <br />11 <br />84/0.19 3.0 <br />126/028 1 4.5 <br />168/0.37 1 5.2 <br />210/0.47 7.0 <br />MAXIMUM HEAD LOSS <br />1.7 FEET <br />2.3 FEET <br />1 2.9 FEET <br />3.5 FEET <br />.110' [8.007 TYPICAL <br />WAIL THICKNESS. <br />0111' MAXIMUM. <br />SEE NOTE 3. <br />4.00' <br />[4&007 <br />A I 11.0o' <br />1 [60.007 <br />VENTED OUTLET <br />FROG. <br />MINIMUM DEPTH. <br />LJOL3Perk Fil ter TM 0 O1deaS'tle® <br />®®®Stormwater Solutions <br />4' Wide Concrete Vault 7921 SDWpe'k PIM. Suite 2001 Lftftb . CO 1801201 Ph: 8DOZM 8819 <br />THS DOmoff m THE PW <br />U9EDNMYWAYNIURMS• <br />FM L Three to Seven Cartridges/ Stacks DRAWING <br />•18" MAXIMUM. <br />SEE NOTE 3. <br />JPR 7/8/08 ISHEEr 2 OF 2I <br />BRFARROYO GREEN APARTMENTS- TOT-TTT BRADFORD STREET <br />IOaSTORM WATER OPERATION AND MAINTENANCE <br />YEARS EXHIBIT B (CON'T) <br />ENGINEERS . SURVEYORS . PLANNERS Drawn LP Checked CFG A roved CFG <br />1730 NORTH FIRST STREET., SUITE 600 (408) 467-9100 PP <br />SAN JOSE, CA 96112 www.bkf.com Job No. 20166073 Date 02/15/2019 Sheet 4 X64 <br />