My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-03-25 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-03-25 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 11:00:38 AM
Creation date
3/22/2019 1:01:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/25/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.B. - Page 75 of 77 <br />EXHIBIT B <br />Creekside Parcel <br />Page 2 of 2 <br />North 3° 27 21" West, 52.71 feet to the beginning of a tangent curve to the right; thence <br />10. Along said curve having a radius of 175.20 feet, through a central angle of 41° 46'45 <br />for an arc length of 127.75 feet; thence <br />11. North 321 17' 02" West, 11.76 feet to a point on the Southeasterly boundary of the lands <br />of Chevron U. S.A., Inc., a California Corporation per Grant Deed recorded in Volume <br />5285 of Official Records, at Page 403, San Mateo County Records; thence along said <br />boundary, and along the lands conveyed to Standard Stations, Inc., per Grant Deed <br />recorded in Volume 618 of Official Records, at Page 232, San Mateo County Records <br />12. North 570 42' 58" East, 6926 feet to an angle point in the Southeasterly boundary of said <br />lands of Standard Stations; thence continuing along said boundary <br />13. North 780 37' 58" East, 74.46 feet to the TRUE POINT OF BEGINNING. <br />Containing 24,893 square feet or 0.5714 acres, more or less. <br />The above-described parcel is shown on the plat entitled, "Plat of Creekside Trail Parcel" <br />attached hereto and made a part hereof. <br />Description prepared by BKF Engineers, in January, 2019, <br />PS4 "�4 1/31/2019 <br />Signed <br />cr Date <br />BKF No. 20166073 <br />Pagc 2 o['2 <br />ATTY/AGR/2019.062/MP BRADFORD ASSOCIATES, L.P., -CREEKSIDE TRAIL IMPROVEMENT AGREEMENT <br />REV: 03-21-19 PR Page 2 of 3 90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.