My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:54:06 AM
Creation date
4/4/2019 4:43:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/8/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.F. - Page 25 of 32 <br />X4101 Huam <br />DEVELOPMENT DEPARTMENT <br />www.redwoodcity.org <br />January 8, 2019 <br />Disney Construction, Inc. <br />Attn: Rick Disney <br />533 Airport Boulevard, Suite 120 <br />Burlingame, CA 94010 <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br />Main: 650.780.7380 <br />Fax: 650.780.7309 <br />PROJECT: CALIFORNIA WATER TANK, PUMP STATION & TRANSMISSION MAIN <br />PROJECT — Bid Opening Dated December 19, 2018. <br />SUBJECT: BID RESULT NOTIFICATION AND CONFIRMATION <br />The City has completed its bid evaluation. <br />Analysis: Disney Construction Inc.'s Total Base Bid did not equal the summation of all of the <br />Line Item Costs in the Base Bid Schedule. Per Section 00200 1.14F of the project <br />specifications, the discrepancy between the Base Bid line item totals and the Base Bid Total <br />shall be resolved in favor of the correct sum of the Base Bid line items. Secondly, the Base Bid <br />Line Item #14 total does not equal the product of the unit price and the line item quantity. Per <br />Section 00200 1.14E of the project specifications, the unit price shall prevail. <br />Conclusion: In evaluating the bid and resolving the discrepancies noted, Disney Construction <br />Inc. is the apparent low bidder with a Total Bid of $10,022,000. <br />Confirmation Request: Please submit in writing within one (1) day of this notification to confirm <br />that Disney. Construction Inc. agrees with the bid evaluation, and is able and willing to perform <br />the work for the total bid of $10,022,000; or to provide the City with a written request for the <br />relief of bid per Section 5103 of the Public Contract Code for further consideration. <br />If you have any questions, please contact Patrick LaBruzzo at (650) 780-7366 or <br />plabruzzo@redwoodcity.org. <br />Sincerely, <br />Saber Sarwary, <br />City Engineer <br />Send via email. <br />Att: Bid schedule <br />132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.