Laserfiche WebLink
<br />EXHIBIT A <br />Scope of Services and Fees <br /> <br />JJR Construction, Inc <br />FY 2007-2008 Unit Bid Prices <br /> <br />BID 2005-2006 2007 CPI 2007 -2008 <br />ITEM Unit Bid % Unit Bid <br />NO. DESCRIPTION Prices Increase Prices <br />1 Remove Existing sidew~~ $5.00 3.3% $5.17 <br />2 Construct concrete sidewalk $8.00 3.3% $8.26 <br />2a Install Rubber Sidewalk $20.00 3.3% $20.66 <br />3 Remove existing driveway $6.00 3.3% $6.20 <br />4 Construct concrete driveway $8.00 3.3% $8.26 <br /> Remove existing Curb and <br />5 loutter $15.00 3.3% $15.50 <br /> Construct concrete curb and <br />6 loutter $30.00 3.3% $30.99 <br />7 Remove walkway material $8.00 3.3% $8.26 <br /> Construct wheel chair ramp <br />8 I(c&o paid under bid item #6) $20.00 3.3% $20.66 <br />9 Remove and replace AC pavino $12.00 3.3% $12.40 <br />10 Install irrioation system $10.00 3.3% $10.33 <br />11 Install tree grates $700.00 3.3% $723.10 <br />12 Additional subbase excavation $40.00 3.3% $41.32 <br />13 Drain Line installation $100.00 3.3% $103.30 <br />