My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 JJR Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 JJR Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2009 11:15:07 AM
Creation date
7/13/2006 1:28:22 PM
Metadata
Fields
Template:
Agreement
Contractor Name
JJR Construction, Inc.
PROJECT NAME
Cost Shared Sidewalk Repair Project
RMP File Number
304
Date
7/12/2006
MO Ref
06-119, 07-094, 09-197
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT A <br />Scope of Services and Fees <br /> <br />JJR Construction, Inc <br />FY 2007-2008 Unit Bid Prices <br /> <br />BID 2005-2006 2007 CPI 2007 -2008 <br />ITEM Unit Bid % Unit Bid <br />NO. DESCRIPTION Prices Increase Prices <br />1 Remove Existing sidew~~ $5.00 3.3% $5.17 <br />2 Construct concrete sidewalk $8.00 3.3% $8.26 <br />2a Install Rubber Sidewalk $20.00 3.3% $20.66 <br />3 Remove existing driveway $6.00 3.3% $6.20 <br />4 Construct concrete driveway $8.00 3.3% $8.26 <br /> Remove existing Curb and <br />5 loutter $15.00 3.3% $15.50 <br /> Construct concrete curb and <br />6 loutter $30.00 3.3% $30.99 <br />7 Remove walkway material $8.00 3.3% $8.26 <br /> Construct wheel chair ramp <br />8 I(c&o paid under bid item #6) $20.00 3.3% $20.66 <br />9 Remove and replace AC pavino $12.00 3.3% $12.40 <br />10 Install irrioation system $10.00 3.3% $10.33 <br />11 Install tree grates $700.00 3.3% $723.10 <br />12 Additional subbase excavation $40.00 3.3% $41.32 <br />13 Drain Line installation $100.00 3.3% $103.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.