Laserfiche WebLink
4/24/00 <br />EXHIBIT "A" <br />TABLE 1 <br />TRAFFIC IMPACT MITIGATION FEE PROJECTS <br />Project <br />Public Facility Improvement <br />Cost <br />(incl R/W) <br />Intersection Improvements <br />El Camino ReaUWhipple <br />Add westbound free right tam and merge lane <br />$200,000 <br />eterans/Whipple <br />Add eastbound right rum lane <br />$413,249 <br />Veterans/Middlefield <br />Install traffic signal <br />$175,000 <br />E1 Camino Real/Beech- Lincoln <br />Median closure <br />$30,000 <br />B ay/Fifth <br />Install traffic signal <br />$130,000 <br />Various Intersections (4) <br />Install lighted pedestrian crossings <br />$60,000 <br />Subtotal <br />$1,008,249 <br />Corridor and Areawide Improvements <br />W oodside Road (El Camino to US 101) <br />Widen to 6 lanes <br />$2,400,000 <br />W oodside Road (El Camino to west of Valota) <br />Widen to 6 lanes, median closures <br />$1,559,000 <br />lomquist Road Extension <br />Extend to East Bayshore, bridge Redwood Creek <br />$7,067,000 <br />V eterans Boulevard <br />Widen to 4 lanes bet. Chestnut and Woodside <br />$280,154 <br />t Bayshore Road <br />Widen south of Whipple Ave. <br />$650,000 <br />N eighborhood Traffic Management Programs <br />Alleviate cut - through traffic and speeding <br />$890,000 <br />Subtotal <br />$12,846,154 <br />Alternative Modes/Transit <br />V arious Transit and TDM Measures <br />$3,250,000 <br />Subtotal <br />$3,250,000 <br />Administrative Costs <br />Pre paration of Traffic Mitigation Fee Study <br />$90,000 <br />Ci ty Administrative Costs (235) <br />$343,888 <br />ubtotal <br />$433,888 <br />rand Total <br />$17,538 291 <br />13885 <br />