My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Harty Pipelines, Inc. of
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Harty Pipelines, Inc. of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2007 12:34:21 PM
Creation date
7/21/2006 1:51:54 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Harty Pipelines, Inc.
PROJECT NAME
2005-2006 Storm Drain Improvement Project
RMP File Number
304
Date
7/14/2006
MO Ref
06-139
Box
6571
Sticky Note
ID:
1
Text:
Pg 1-4 Agreement
Pg. 5-8 Faithful Performance Bond
Pg. 9-12 Payment Bond
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />AGREEMENT <br />for the <br />City of Redwood City <br /> <br />ORIGINAL <br /> <br />2005-2006 STORM DRAIN IMPROVEMENT PROJECT <br /> <br />THIS AGREEMENT, made this 14thdayof July, 2006, by and between Harty <br />Pipelines, Inc., whose place of business is located at 4085 19th Avenue, San Francisco, California, <br />hereinafter called "CONTRACTOR", and the City of Redwood City, a Charter City and municipal <br />corporation of the State of California, hereinafter referred to as "CITY". <br /> <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br />as follows: <br /> <br />I. <br /> <br />II. <br /> <br />III. <br /> <br />WORK <br /> <br />A. <br /> <br />Contractor shall complete all Work specified in the Contract Documents, in <br />accordance with the Specifications, Drawings, and all other terms and conditions <br />of the Contract Documents. <br /> <br />CONTRACT SUM <br /> <br />A. <br /> <br />City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract Documents, as the amount of Two Hundred Ninety <br />Two Thousand Eight Hundred Fifty and No/100 Dollars ($292,850.00), computed in <br />accordance with Contractor's Accepted Proposal dated, June 21, 2006, which <br />Proposal is incorporated herein by reference thereto as if fully set forth. <br /> <br />B. <br /> <br />The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other <br />taxes on any item or service that is part of the Work, whether such taxes are <br />normally included in the price of such item or service or are normally stated <br />separately. Notwithstanding the foregoing, each party shall bear such state or local <br />inventory, real property, personal property or fixtures taxes as may be properly <br />assessed against it by applicable taxing authorities. <br /> <br />CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />A. <br /> <br />Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br /> <br />1. <br /> <br />Contractor shall achieve Substantial Completion of the Work within Forty Five <br />(45) Calendar Days from the date the Contract Time commences to run. <br /> <br />B. Liquidated Damaqes <br /> <br />ATTY/AGR/2006.030 <br />062306 <br />
The URL can be used to link to this page
Your browser does not support the video tag.