My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Alta Planning + Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Alta Planning + Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:08:06 PM
Creation date
4/16/2019 11:36:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Alta Planning + Dsign
PROJECT NAME
Jefferson Ave and Clevland St. safety improvements (PS&E)
RMP File Number
304
Date
4/11/2019
MO Ref
19-067
Document Relationships
MO 19-067
(Message)
Path:
\City Clerk\Minute Orders\2010-2019\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />SCOPE OF SERVICES AND FEE <br />Development of Plans, Specifications, and Estimates (PS&E) for Jefferson/Clinton <br />intersection <br />The selected preferred alternative for Jefferson/Clinton intersection is installation of a Pedestrian <br />Hybrid Beacon. After development of the 15% Concept Plan Layout, Consultant shall begin <br />working on design documents through final design with 65%, 90% and 100% (Final) document <br />deliverables. <br />All project development phases shall proceed in parallel with Jefferson/Cleveland intersection <br />improvement project. <br />Scope of work and details for Task.1 through Task. 5 are aligned with these tasks for <br />Jefferson/Cleveland intersection improvement project in the Original Agreement and modified for <br />design of the preferred alternative for Jefferson/Clinton intersection. <br />Task 1: Topographic Survey and Mapping <br />Consultant shall prepare topographic mapping of the project area and for conforms in all <br />directions. The topographic survey of the project area shall be at a scale of V = 20'. The survey <br />shall show the location of existing trees, structures, walkways, fences, adjacent roadways, and <br />utility information within the project areas. Contours shall be shown at one -foot intervals or as <br />appropriate to clearly define the slopes. Spot elevations collected by ground surveys, including <br />finish floor elevations, shall be shown to an accuracy of 0.01' (one hundredth) of a foot. <br />The location of utility vaults, manholes, catch basins, and invert information of storm and sanitary <br />sewers shall be shown based upon a field survey. The location of underground utilities lines such <br />as gas, water, electric, and any onsite utilities shall be shown based upon available City records. <br />Horizontal datum shall be based on the California Coordinate System, NAD83, Zone 3 and the <br />vertical datum shall be based upon NAVD88. Mapping of existing utilities shall include utilities that <br />are visible and accessible from ground level. Dipping storm drain manholes and catch basins (as <br />needed) for inverts. <br />In addition to the above the location of the public right or way limits shall be delineated based on <br />publicly available records. City will provide right of way data to Consultant. This will not constitute <br />a full boundary survey of the adjacent parcels. <br />Task 2: Utility Research <br />Consultant shall research subsurface utilities in the project extents and incorporate utility <br />agencies' record drawings of underground utility information into the survey mapping. Where <br />REV: 11-01-19 PR <br />ATTY/AGR.Amend No. 1/Alta Planning + Design (Page 3 of 7) <br />
The URL can be used to link to this page
Your browser does not support the video tag.