My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Economic and Planning Systems, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Under 60K
>
Agmt19 Economic and Planning Systems, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2022 3:47:50 PM
Creation date
4/18/2019 2:44:12 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Economic and Planning Systems, Inc.
PROJECT NAME
Residential and Commercial development Nexus study
RMP File Number
304.5
Date
4/16/2019
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 02-17-2022 RL <br />Exhibit “A” <br />SCOPE OF SERVICES AND FEE <br />This describes the scope, staffing, budget, and schedule to prepare a Benefit Cost Analysis (BCA) <br />for the US 101/SR 84 Woodside Interchange Improvement Project (hereafter “Interchange <br />Project”). The Consultant analysis will meet the requirements of the federal INFRA Discretionary <br />Grant Program. <br />Task 1: Initiate Project and Review Available Information <br />Consultant will meet with City staff and other study participants (e.g., consultants and other <br />partner agencies) to clarify project goals, data needs, schedule, and related study parameters. <br />We will discuss possible methodological approaches to quantifying the economic benefits of the <br />Interchange Project. Consultant will also review relevant literature, project plans, travel demand <br />model results, federal grant guidance, and other materials to identify data needs and ensure that <br />the Study meets the standards needed by local stakeholders and grant funders. <br />Task 2: Define Analytical Alternatives and Costs <br />The BCA will compare the net present value of the proposed project against a “no-build” scenario <br />over a specified timeframe (usually between 20 to 30 years). As such, Consultant will work with <br />City staff and other study consultants to define the analytical alternatives and associated capital <br />and operations and maintenance costs for each. Given the important role of time in the <br />calculations, it will be important to develop estimates for both capital and maintenance costs on <br />an annual basis and develop detailed assumptions related to the phasing of both (e.g., the <br />schedule for project completion, start of operation, and useful life of associated improvements). <br />Task 3: Describe and Quantify Project Benefits <br />Consultant will work with City staff and other study consultants to identify and monetize the range <br />of transportation benefits anticipated from the Interchange Project. Other benefits may also be <br />evaluated based on the local context and qualitative and quantitative information available. <br />Consultant will coordinate with the study team to identify any transportation modeling results and <br />related assumptions for use in the analysis. <br />Task 4: Conduct the Benefit-Cost Analysis <br />Consultant will evaluate project costs and benefits over time based on the results from Tasks 2 <br />and Task 3. The results will be tabulated in an excel spreadsheet model to sum the present value <br />of project benefits relative to the “no build” scenario and compare them to the present value of <br />the costs. The ratio between the benefits and costs is the benefit-cost ratio, an important metric <br />for evaluating project performance. The Consultant team will present the overall benefits and <br />costs for the Proposed Project compared to the “no build” scenario in tabular and graphic form. <br />The excel model will provided in a user-friendly format to facilitate review by the City and address <br />INFRA Discretionary Grant Program application requirements. <br />Task 5: Meetings and Deliverables <br />Consultant will prepare a draft report documenting study findings and including all related charts, <br />tables, and supporting data for review by City. This document will categorize all benefits evaluated <br />and describe in detail the calculation used to analyze each benefit and cost. Consultant will <br />produce a final BCA report that reflects feedback from the City. Consultant will ensure that the <br />deliverable meets the requirements of the INFRA Discretionary Grant Program. <br />Consultant will participate in virtual meetings with City staff and others as needed. The budget <br />estimate provided below assumes up to 10 virtual meetings. <br />ATTY/AGR.2022 - Amend No. 2/Economic and Planning Systems (Page 3 of 4)
The URL can be used to link to this page
Your browser does not support the video tag.