My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 7:49:21 AM
Creation date
4/19/2019 5:03:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/22/2019
Jump to thumbnail
< previous set
next set >
Callout
ID:
1
Creator:
Created:
4/19/2019 5:05 PM
Modified:
4/19/2019 5:05 PM
Text:
Proposed California Water Storage Tank, Pump Station, and Pipelines.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Clie it \06-09-01 Water System Master Plan\GIS\Fi ures\Fi ure 6-22 CIP Hillside Area.mxd <br />Capacity and Reliability Program: <br />CAP -1: 0.75 MG California Tank, Pump Station and Pipeline <br />New Generator at Cambridge PS <br />New Regulators at Wilmington and Glenloch Tanks <br />1,600 ft of pipeline improvements for fire flow <br />CAP -2: 15,400 ft of pipeline improvements for fire flow <br />Pipeline and Facility Replacement Program: <br />PRP -1: 5,700 ft of pipeline improvements <br />FIGURE 6-22 <br />City of Redwood City <br />Water System Master Plan <br />CAPITAL IMPROVEMENT <br />PRP -2: 28,600 ft of pipeline improvements <br />FRP-1: Rehabilitate Cambridge PS, Carson PS, and California PS <br />PROJECTS, HILLSIDE AREA <br />FRP-2: Rehabilitate Edgewood PS and Glenloch PS <br />Steel Tank Recoating Project <br />Wilmington Tank Replacement <br />Seismic Improvement Program: <br />SIP -1,-2,-3 at Multiple Tank and Pump Station Sites <br />For clarity, long-term programs (CAP -3, PRP 3 through 7, FRP-3 and SIP -4) not shown <br />Edgewo <br />% <br />Re i tia <br />9 <br />0 1,250 2,500 <br />�. <br />Scale in Feet <br />i <br />LEGEND <br />Capacity and Reliability Program <br />Glenloch ST ch PS <br />Storage Tank - CAP -1 <br />\ _ <br />Lak iew STLakeview <br />on P <br />G3 Pump Station -CAP-1 <br />® Regulator - CAP -1 <br />O Regulator - CAP -2 <br />Pipelines - CAP -1 <br />- Pipelines - CAP -2 <br />Pipeline and Facility Replacement Program <br />PRP -1 <br />\ <br />PRP -2 <br />er Bo <br />C S brid <br />m 'd <br />FRP-1 <br />0 FRP-2 <br />East s S <br />Seismic Improvement Program <br />• SIP -1 <br />Wi ing n <br />O SIP -2 <br />- <br />• SIP -3 <br />Wilmington PS <br />Focus Area <br />0 <br />i <br />WEST YOST <br />IN=edwood ��� <br />ASSOCIATES <br />c Consulting Engineers <br />GK fteLePlltKg & (�1f1(01L <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.