6.A. - Page 13 of 16 <br />EXHIBIT A <br />SCOPE OF SERVICES <br />SCOPE OF WORK <br />The work in this contract is to provide Geotechnical Engineering Services for the <br />construction phase of the California Water Tank, Pump Station and Transmission Main <br />Project_ Consultant will provide both full-time and part-time inspection as needed, to <br />include observation and testing as necessary of the Specific Geotechnical Tasks <br />outlined below related to the performance of the proposed structures in the Project. <br />1. Mass Grading <br />2. Aggregate Pier Installation — Soil Improvement for Water Tank Foundation <br />3. Soil Nail Installation — Soil Reinforcement for Retaining Wail <br />4. Spread Footing Excavation — Preparation Installation previous to Footing Pouring <br />5. Sub -drain Installation <br />Services will include observation, laboratory testing as necessary to document <br />specification compliance, and to confirm field observations; provide consultation via <br />telephone or email correspondence as needed for the project. <br />Services not included in this agreement are geotechnical observation and testing of the <br />non-structural tasks of the project, including utility trench backfill, flatwork subgrade and <br />aggregate base, pavement subgrade, aggregate base and asphalt concrete. <br />LEVEL OF EFFORT/TASKS/ALLOCATION OF RESOURCES <br />Ifty <br />. K171118,139190 <br />Page 9 of 12 <br />ATTY/AGR.2019.080 /Cornerstone Earth Group, Inc. <br />W <br />Estimated <br />Estimated <br />Estimated <br />No. of <br />Hours per <br />Total <br />Number of <br />Field Inspection Tasks <br />Personnel <br />Site <br />Visit <br />Hours <br />Density <br />Visits <br />Tests <br />Meetings/Consultation <br />Sr. Prin. <br />2 <br />3 <br />6 <br />0 <br />Eng. <br />Meetings/Consultation <br />Proj. <br />2 <br />4 <br />8 <br />0 <br />Geologist <br />Mass Grading (hillside) <br />Eng. Tech <br />11 <br />12 <br />9 <br />108 <br />113 <br />Mass Grading (rough <br />Eng. Tech <br />8 <br />8 <br />64 <br />67 <br />grading) <br />11 <br />Aggregate Pier <br />Staff Eng. <br />8 <br />10 <br />80 <br />0 <br />Install/Testing <br />Soil Nail <br />Staff Eng_ <br />11 <br />9 <br />99 <br />0 <br />Installation/Testing <br />Spread Footing <br />Staff Eng. <br />10 <br />2 <br />20 <br />0 <br />Excavations <br />Observe Subdrain <br />Eng. Tech <br />11 <br />3 <br />2 <br />6 <br />0 <br />TOTAL <br />87 <br />391 <br />180 <br />Ifty <br />. K171118,139190 <br />Page 9 of 12 <br />ATTY/AGR.2019.080 /Cornerstone Earth Group, Inc. <br />W <br />