Laserfiche WebLink
EXHIBIT B <br />SCHEDULE OF IMPROVEMENTS <br />YEAR <br />Description of work done or to be done <br />2017 <br />(for reference) <br />Seismic retrofit of above ground basement — completed by Peace of <br />Mind Structural <br />Replace main sewer line — completed by Roto Rooter <br />Remodel top floor to include reframing for structural integrity, insulation, <br />electrical update, new flooring, windows — completed by Pilarcitos <br />Construction <br />2018 <br />for reference <br />Replace back porch and stairs, improved construction and structural <br />integrity — com leted by J. Perretti Builders <br />2019 <br />Replace broken back door — improve entrance for weather seal and <br />security — proposal in hand <br />Stain/paint driveway ate — proposal in hand <br />Inspect, repair, and restore roof, as necessary <br />2020 <br />Maintenance of trees and landscaping as necessary <br />Inspect, repair, or replace east side wood fence <br />2021 <br />as needed, main floor double -hung original windows <br />-Repair, <br />Inspect and clean roof gutters <br />2022 <br />Inspect, repair, clean, and paint as necessary the exterior of the house <br />2023 <br />Inspect and clean roof gutters <br />2024 <br />Inspect, repair, and restore roof, as necessary. <br />2025 <br />1 Maintenance of trees and landscaping as necessary <br />2026 <br />Inspect and clean roof gutters <br />2027 <br />Repair, as needed, main floor double -hung original windows <br />2028 <br />Maintenance of trees and landscaping as necessary <br />Page 12 of 14 <br />REV: 09-11-18 PR <br />ATTY/AGR.2018.216/Mills Act Contract for 221 Standish (Laura Stewart, Property Owner) <br />