Laserfiche WebLink
· ' Project Study Report (Local l~*habilitatlon) <br />· (For 1998 STIP Projects Off t~v. tare Highway System) _ <br /> December 7, i998 <br /> <br /> 12. Cost Estimate Breakdown Cpst <br /> ENVIROINr/VIENTAL STUDIES AND PERM/TS N/ <br /> PLANS. SPECIFICATIONS. AND ESTIMATE 50: 000 <br /> <br /> RIGHT OF WAY <br /> Right of Way Acquisition ' <br /> Right of Way Support <br /> Utilky Relocation (exclude if included in co~sU'ucfion) <br /> TOTAL RIGHT OFWAY COM?ONE.N~ COST <br /> <br /> " CONSTRUCTION <br /> <br /> pavement Structural Section Work Lane-Miles Cost <br /> AC Overlay <br /> Other AC . <br /> Remove & replace localized failed areas <br /> B~se matexials <br /> Shoulder backing <br /> Other structmml section work (Identify) ~70.0(]0 <br /> <br /> Hardware Unto'ados <br /> Ouarctrail <br /> Signals and llghfing 2B,000 <br /> Other (describe) 5: 000 <br /> <br /> Brifl~te Un,rares ~B(]. 000 <br /> Gradina <br /> Dralna~c RehabilitatiOn ' <br /> Utility Relocation 600.00 <br /> Traff, c Control 20,00 <br /> Tr~ffic strives, oavcment markers and markings <br /> Other (Identify: e.g., Mobilization Cost, Hazardous W~te 10,00 <br /> Mitigation, Force Account. da), labor, etc.) <br /> SUBTOTAL 2~.255 i;00 <br /> 20% Contingency 451. 000 <br /> <br /> TOTAL CONSTRUCTION COST 2~706,000 <br /> C~tructlon Suooort 405,9 <br /> TOTAL CONSTRU~..;~ION COMPONENT COST <br /> <br /> 13. SebeduUng · <br /> <br /> Proiect Comnonent Start Date Estimated C0nlplefipll <br /> Environmental Studies and Permits 1/2000 6 / <br /> Plans, Specifications, and Estimate 1/2000 6/2000 <br /> Right of WayAcquisition N/A <br /> Construction 7/2000 <br /> <br /> 14, Othez;Agene~es Involved: (Permits/Approvals from Fish <br /> Commission, etc.) <br /> ! N/A <br /> <br /> 3 13744 <br /> <br /> <br />