My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Bay Area Geotechnical Group - Consulting Geotechnical Engineering Services
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 Bay Area Geotechnical Group - Consulting Geotechnical Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 10:51:34 AM
Creation date
10/2/2006 9:45:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Geotechnical Group
PROJECT NAME
Consulting Geotechnical Engineering Services
RMP File Number
304
Date
9/28/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BAGG SCHEDULE OF CHARGES <br /> <br />A new schedule of charges is issued early each year. Unless other arrangements have been made, job charges are made from the latest schedule <br />regardless of when the job was started. <br /> <br />PERSONNEL CHARGES <br /> <br />Personnel charges are based on individual salaries times a multiplier determined in accordance with Manual No. 45 ofthe American Society <br />of Civil Engineers. Following are the current ranges in billing rates for each category of personnel: <br /> <br />Personnel <br /> <br />Hourly <br />Hillin!!: Rates <br /> <br />Principal/Supervisory Engineer ............................................................. $ <br />Senior Engineer/Geologist, & Project Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Project Engineer/Geologist, Supervisory Technician. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Staff Engineer/Geologist .................................................................. <br /> <br />Technician ............................................................................. <br />Drafting including Computer Aided Drafting (CAD) ............................................ <br />Support Services (Word-processing, Reproduction, etc.) ......................................... <br /> <br />150-165 <br />125-135 <br />105-115 <br />90-105 <br />85-100 <br />75-100 <br />40-50 <br /> <br />Personnel charges are for technical work. Charges are made for typing and for the time and costs of compiling and printing technical reports. <br />Charges are not made for office management. <br /> <br />A premium multiplier of 1.5 is applied to technician rates on Saturdays, on night shifts, and over 8 hours on weekdays. The multiplier is 2.0 <br />for work on Sundays, and 2.5 for work on holidays. Premium rates are not charged for the time of geologists, engineers, managers, or principals <br />unless the client has approved them. All personnel charges are portal to portal. Travel time is charged up to a maximum of 8 hours per day. <br /> <br />For field observation and testing personnel, time up to 2 hours is charged as 2 hours, time between 2 and 4 hours is charged as 4 hours, and <br />time between 4 and 8 hours is charged as 8 hours. <br /> <br />Outside consultants' fees and expenses are charged at cost plus 15%. <br /> <br />Expert testimony for depositions, court appearances, and other dispute resolution proceedings is charged at $300 per hour plus expenses. <br />Research, analysis, consultation, meeting and other preparation services are charged at $150 per hour. <br /> <br />EQUIPMENT CHARGES <br /> <br />The following charges are for special equipment and are in addition to personnel charges: <br /> <br />Nuclear Density Gauge, per hour. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.00 <br />Car or Pick-up Truck, per mile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.75 <br />Printing and Reproduction, per sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.15 <br />Drill Rig Rental and Operation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost plus 15% <br />Outside Laboratory Testing ........................................................ Cost plus 15% <br />Other Special Equipment ........ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prices on Request <br /> <br />Equipment in transit to or from the job site, or retained by the Client on a standby basis, is billed on the basis offour hours per calendar day, <br />or at actual cost (plus 15 percent) in case of equipment which is leased or subleased or otherwise arranged for by Bay Area Geotechnical Group <br />through its subcontractors or others. <br /> <br />If equipment is exposed to unusual and adverse conditions, an appropriate charge will be made for resultant abnormal deterioration. <br /> <br />(7/06) <br /> <br />-1- <br /> <br />a~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.