My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt02 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2002
>
Agmt02 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 7:11:43 PM
Creation date
3/18/2002 8:22:31 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
5th Ave. Storm Drainage Pump
RMP File Number
304
Date
3/13/2002
MO Ref
02-52
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> <br /> Fifth Avenue Pump Station <br /> Scope of Work <br /> <br />PHASE I. PRELIMINARY DESIGN <br /> <br />The preliminary design phase is when the alternatives will be evaluated and critical <br />design decisions will be made. In addition to reviewing existing data we will meet with <br />the city and owner of the mobile home park. During the preliminary design BKF will be <br />evaluating pumping alternatives including the use of submersible pumps to reduce noise <br />and the surface structure. During this phase we will also be investigating the use of the <br />existing generator to service the pump station while the pumping capacity is limited to 30 <br />csf. Environmental review and approving agencies will be identified and listed for City <br />review. The intent will be to prepare a negative declaration for the project. <br /> <br />Task 1 - Design Development/Design Report <br /> <br /> 1. Review of exiting materials <br /> 2. Meeting with property owner & City staff <br /> 3. Meeting with operations to discuss needs for new pump station <br /> 4. Prepare 10' scale aerial topo of site on City datum <br /> 5. Investigate pumping alternatives <br /> 6. Develop 2 alternate building plans for generator <br /> 7. Prepare cost estimates of construction costs <br /> 8. Identify environmental review agencies <br /> 9. Meetings with City staff to review findings <br /> 10. Prepare design report <br /> 11. Incorporate City comments and prepare final Draft report <br /> 12. Administration including weekly project log <br /> <br />Deliverables: <br />· A list of property owners concerns. <br />· A list of the environmental review agencies. <br />· A preliminary plan layout for the new pump station. <br />· A preliminary plan for the generator/control building. <br />· A Draft report outlining the alternatives with preliminary construction and <br /> operating cost estimates. <br /> <br />PHASE II. DESIGN <br /> <br />Upon completion of Phase I, a scope of work and fee will be established for Phase II. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.